Vsebina

DG TAXUD

Business continuity plan

for Economic Operators

ICS2

Date: 28/07/2023

Doc. Version: 1.20

Business continuity plan ICS2

Date: 28/07/2023 2 / 31 Doc. Version: 1.20

Document Control Information

Settings Value

Document Title: Business continuity plan for Economic Operators

Project Title: ICS2

Document Author: DG TAXUD Unit A3

Project Owner: DG TAXUD Unit A3

Doc. Version: 1.20

Sensitivity: Sensitive Non Classified

Date: 28/07/2023

Document Approver(s) and Reviewer(s):

NOTE: All Approvers are required. Records of each approver must be maintained. All reviewers in the list are

considered required unless explicitly listed as Optional.

Name Role Action Date

ECCG Approve 10.06.2022

TCG Review 04.04.2022

Document history:

The Document Author is authorized to make the following types of changes to the document without requiring

that the document be re-approved:

 Editorial, formatting, and spelling

 Clarification

To request a change to this document, contact the Document Autho r or Owner.

Changes to this document are summarized in the following table in reverse chronological order (latest version

first).

Revision Date Created by Short Description of Changes

1.20 28.07.2023 DG TAXUD  Cross-references updated in all the

document;

 Section 3.2.2 updated by removing statement

that UUM&DS national component

information is cached in TAPAS for 24 hours

and descriptions having impact of this change.

1.10 10.06.2022 DG TAXUD Document updated to implement DG TAXUD,

ECCG and TCG comments. Sent out for approval

(SfA).

1.04 08.06.2022 DG TAXUD Document updated to implement ITSM3 and

QA4 comments.

1.03 04.04.2022 DG TAXUD The following sections were updated based on

the input from the expert group held on

30.03.2022. – sections 3.4 and 3.6.1. Submitted

for review (SfR).

1.02 24.03.2022 DG TAXUD Document updated based on the input from the

expert group held on 16.02.2022 and

09.03.2022.

1.01 07.02.2022 DG TAXUD Document updated to cover ICS2 Release 1 and

ICS2 Release 2 needs. Sent out to ICS2 Expert

group for information before the second expert

group meeting planned on 16.02.2022.

1.00 11.02.2021 DG TAXUD Submitted for approval (SfA)

0.60 11.02.2021 DG TAXUD Document updated after ITSM3 TES and Member

State review

Business continuity plan ICS2

Date: 28/07/2023 3 / 31 Doc. Version: 1.20

0.50 09.12.2020 DG TAXUD Document updated based on the input from the

PG held 30.11.2020

0.42 05.11.2020 DG TAXUD Document updated based on the input from the

PG held 13.10.2020

0.30 13.10.2020 DG TAXUD Document updated with more detailed

information

0.20 11.09.2020 DG TAXUD Document updated based on the first PG

24.07.2020 input

0.10 24.07.2020 DG TAXUD Initial draft of the document

Business continuity plan ICS2

Date: 28/07/2023 4 / 31 Doc. Version: 1.20

TABLE OF CONTENTS

1 INTRODUCTION ................................................................................................................................... 5

1.1 Purpose ............................................................................................................................................. 5

1.2 Scope ................................................................................................................................................. 5

1.3 Target Audience ................................................................................................................................ 5

1.4 Structure of this document ............................................................................................................... 5

1.5 Reference and applicable documents ............................................................................................... 6

1.5.1 Reference Documents ................................................................................................................ 6

1.6 Abbreviations and Acronyms ............................................................................................................ 6

1.7 Definitions ......................................................................................................................................... 7

2 SOURCES OF SYSTEM UNAVAILABILITY ............................................................................................... 8

3 BUSINESS CONTINUITY MEASURES AND COMMUNICATION ............................................................... 9

3.1 Economic operator system unavailability ......................................................................................... 9

3.1.1 Unavailability identification and notification ............................................................................. 9

3.1.2 Activation of Business continuity plan ..................................................................................... 10

3.1.3 Business continuity measures .................................................................................................. 10

3.1.4 Recovery communication ......................................................................................................... 11

3.1.5 Recovery measures .................................................................................................................. 11

3.2 TI unavailability ............................................................................................................................... 13

3.2.1 UUM&DS Central component unavailability ............................................................................ 13

3.2.2 UUM&DS National component unavailability .......................................................................... 16

3.2.3 TAPAS unavailability ................................................................................................................. 19

3.2.4 STI (including STP) unavailability .............................................................................................. 22

3.3 ICS2 Common and/or ICS2 National component unavailability ...................................................... 25

3.3.1 Unavailability identification and notification ........................................................................... 25

3.3.2 Activation of Business continuity plan ..................................................................................... 26

3.3.3 Business continuity measures .................................................................................................. 26

3.3.4 Recovery communication ......................................................................................................... 27

3.3.5 Recovery measures .................................................................................................................. 27

3.4 MON&BS and EUCTP unavailability ................................................................................................ 28

3.4.1 MON&BS unavailability ............................................................................................................ 28

3.4.2 EUCTP unavailability ................................................................................................................. 28

3.5 ICS2 Message prioritisation ............................................................................................................. 29

3.5.1 External domain messages ....................................................................................................... 29

3.6 Information to be provided upon unavailability reporting and (de)activation of BCP ................... 30

3.6.1 EO – unavailability reporting: ................................................................................................... 30

3.6.2 EO – recovery reporting: .......................................................................................................... 30

3.6.3 CSD and NSD – unavailability reporting: .................................................................................. 30

3.6.4 CSD and NSD – recovery reporting: .......................................................................................... 30

3.6.5 Content of notifications to be sent to EO and IT service provider: .......................................... 30

3.6.6 Content of e-mail notifications to be sent to NSD: .................................................................. 30

3.7 Scheduled unavailability ................................................................................................................. 31

3.8 Transition from ICS2 Release 1 to ICS2 Release 2 ........................................................................... 31

Business continuity plan ICS2

Date: 28/07/2023 5 / 31 Doc. Version: 1.20

1 INTRODUCTION

1.1 Purpose

This document describes the impact on a business process and assesses the criticality of an unavailability of a

given component of the ICS2 (Economic operators systems, ICS2 Central components or Member state NES

components). Furthermore, it introduces measures to maintain an appropriate level of business continuity with

regard to the required customs formalities on the entry of goods.

1.2 Scope

This document covers the measures for continuity of the business of ICS2 Release 1 and Release 2 only. DG

TAXUD Business conti nuity plan, DG TAXUD IT Business continuity management systems (IT BCMS), any

Member State , Economic operator and/or IT service provider Business continuity plan, Member State IT

Business continuity plans, Disaster recovery plans and /or IT protocols for te chnical issues are not covered by

this document. These artefacts will be elaborated separately.

1.3 Target Audience

The intended audience for this document are:

 Economic operators having legal obligation to use ICS2;

 IT service providers providing services to those economic operators;

 DG TAXUD;

 DG TAXUD Central service desk;

 National service desks of the Member States;

 ICS2 users in Member States;

 DG TAXUD development contractor.

1.4 Structure of this document

The document contains the following chapters:

 Chapter 1 – Introduction: describes the scope and the objectives of the document;

 Chapter 2 – Sources of system unavailability : provides the system components of ICS2 and a br ief

description of the impact on the business process.

 Chapter 3 – Business continuity measures and communication : provides business continuity

measures, communication of unavailability, and activation of the BCP and recovery of the system, as

well as recovery strategy from a business perspective.

Business continuity plan ICS2

Date: 28/07/2023 6 / 31 Doc. Version: 1.20

1.5 Reference and applicable documents

1.5.1 Reference Documents

Ref. Title Reference Version Date

R01

Regulation (EU) No 952/2013 of the European

Parliament and of the Council of 9 October 2013

laying down the Union Customs Code

09.10.2013

R02

Commission Delegated Regulation (EU)

2015/2446 of 28 July 2015 supplementing

Regulation (EU) No 952/2013 of the European

Parliament and of the Council as regards detailed

rules concerning certain provisions of the Union

Customs Code

28.07.2015

R03

Commission Implementing Regulation (EU)

2015/2447 of 24 November 2015 laying down

detailed rules for implementing certain provisions

of Regulation (EU) No 952/2013 of the European

Parliament and of the Council laying down the

Union Customs Code

24.11.2015

R04 SD3-ICS2-HTI-Interface Control Document 3.30 02.03.2022

Table 1: Reference documents

1.6 Abbreviations and Acronyms

Abbreviation/Acronym Definition

AEO Authorised Economic Operator

ANES Arrival component of Member state’s National entry system

asap As soon as possible

BCP Business continuity plan

DES Customs office of destination

CCN2ng Common Communications Network 2

CFU Customs office of unloading

CNES Controls component of Member state’s National entry system

COFE Customs office of the first entry

CR ICS2 Common Repository

CSD Central Service Desk

DNL Do Not Load

ECCG Electronic Customs Coordination Group

ENS Entry Summary Declaration

EO Economic Operator

EU European Union

EUCTP European Union Customs Trader Portal

HRCM High Risk Cargo and Mail

HTI Harmonised trader interface

ICS2 Import Control System 2

IMS Involved Member State

MON&BS ICS2 Monitoring & Business Statistics

MRN Master Reference Number

Business continuity plan ICS2

Date: 28/07/2023 7 / 31 Doc. Version: 1.20

MS Member State

NES National Entry System

NSD National Service Desk

PNES Presentation component of Member State’s National entry system

RfI Request for Information

RfS Request for Screening

RMS Responsible Member State

STI Shared Trader Interface

STP STI Shared Trader Portal

TCG Trade Contact Group

TI Trader Interface

UUM&DS Uniform User Management and Digital Signatures

Table 2: Abbreviations and acronyms

1.7 Definitions

Term Description

Amendment ENS filing (IE3Axx) lodged by EO to amend previously lodged ENS filing.

asap As soon as possible but no later than 30 min since the moment it is possible

to perform this action.

Central service desk (CSD) The DG TAXUD contractor responsible for the central operation in ICS2

(ITSM) with 1st level and 2nd level support.

EO system System developed by economic operator or IT service provider used to

exchange ICS2 messages.

ICS2 Central components ICS2 CR, STI (including STP), TAPAS, UUM&DS Central component, CCN2 ng,

EUCTP and MON&BS.

ICS2 Common components ICS2 Central components except those being part of Trader interface

(section 3.2).

ICS2 National components NES (RMS), NES (IMS), NES (ANES), NES (PNES), NES (CNES).

Invalidation Request (IE3Q04) sent by EO to invalidate previously lodged ENS filing.

IT service provider IT service provider is entity acting as a technical sender of the messages and

assuming only technical responsibility.

Member state All European Uni on Member states and other countries and territories

applying EU customs legislation.

MS via MON&BS Article 81 of COMMISSION IMPLEMENTING REGULATION (EU) 2021/414

state that MS should apply BCP in case of ICS2 component unavailability. By

approving this d ocument Member states agree that BCP is going to be

activated by MON&BS without human intervention and notified to EOs

(including IT service providers) via EUCTP in accordance with the

requirements of this procedure.

MS user Customs officer, risk analyst or any other person in particular Member state

using ICS2.

National service desk A service component of the National support Centre provided by every

national administration to provide support to both internal MS users and

external end-users (local Economic operators) in the daily use of the ICS2.

Table 3: Definitions

Business continuity plan ICS2

Date: 28/07/2023 8 / 31 Doc. Version: 1.20

2 SOURCES OF SYSTEM UNAVAILABILITY

Depending on the source of unavailability, business continuity procedures will have to vary to some extent due

to their effectivene ss provided in a given case. Looking at it from an end-to-end perspective , the following

causes of unavailability of an electronically supported business process were identified:

 a relevant electronic system of the economic operator is unavailable;

 a relevant electronic national customs application or supporting system is unavailable;

 a relevant central component service is unavailable.

Service providers who provide services for economic operators (e.g. network connectivity, software for

electronic communication/connection with relevant customs systems etc.) are not considered being directly

responsible with regard to legal requirements stemming from the customs legislation. Nevertheless, they have

a responsibility to fulfil the contractual requirements of the established contract with an economic operator

and act in accordance with this procedure if economic operator has empowered IT service provider to report

unavailability and recovery of system on behalf of that economic operator .

In order to implement a sufficient business continuity plan that is underpinned by effective measures the

following factors are to be considered:

 What system component is not available or has a malfunction seriously affecting the business

operations?

 What is the impact of the unavailability of the given system component on the end-to-end process?

 What are the available effective options for efficient and appropriate measures to overcome the

impact?

The following matrix shows the relevant ICS2 system components and their impact on the business process in

case of unavailability:

Table 4 System unavailability

The following subsections will further describe the business continuity measures to be applied in case of

unavailability of each ICS2 component and h ow the unavailability, BCP activation and recovery is

communicated between the Central and National service desks and the economic operators and their IT service

providers, if applicable.

Send ENS

Register

and send

MRN

Lifecycle

validation Referrals Assessment Complete DNL Arrival Presentation Controls

3 0 0 3 2 2 2 0 1

3 0 0 3 3 3 2 0 1

2 0 0 2 0 0 2 0 0

2 0 0 2 0 0 2 0 0

0 3 0 3 3 3 2 0 1

3 3 0 3 3 3 2 0 1

0 0 3 3 3 3 3 3 3

0 0 0 2 0 0 2 3 3

3 Total disfunction

2 Partial disfunction / degradation

1 Limited disfunction (non essential)

No impact

Category A1 - EOS impacted Category A1 - EOS impacted Category B - less time critical

Impact of Component Unavailability on capability

ICS2 National components

STI

STI

STP

ICS2 Common components

CAPABILITIES

IT Component

EO System

TI

TAPAS

UUM&DS

Central Component

National Component

Business continuity plan ICS2

Date: 28/07/2023 9 / 31 Doc. Version: 1.20

3 BUSINESS CONTINUITY MEASURES AND COMMUNICATION

An economic operator is directly responsible to comply with legal requirements of the customs legislation. IT

service provider, CSD and DG TAXUD will support the business continuity process but customs office is always

the one taking decisions and providing in structions for EOs having legal obligation to lodge ENS in its country

in case of unavailability of ICS2 components.

Unavailability (scheduled or unscheduled) is recorded by EO and/or its IT service provider in EUCTP. Upon

registration of unavailability notification confirming successful notification of unavailability will be displayed in

EUCTP notification list.

3.1 Economic operator system unavailability

The unavailability of an economic operator’s system affects either one economic operator or several economic

operators, which e.g. are customers of an IT service provider.

The business continuity measures will depend on which part of the end -to-end process is affected – whether

the ENS filing is already lodged or not, whether consignments have arrived or not etc.

Table 5 EO System unavailability

Figure 1 Business continuity plan activation timeline for EO system

The EO system is considered to be unavailable when it cannot interact (send and/or rece ive messages) as per

the specifications of ICS2 regardless of the reason. If the EO system unavailability can be compensated

(alternatively handled) by another facility of the Economic Operator , IT service provider or by functionality

provided by ICS2 Central components (e.g. STP 1) without impact on the operations continuity, EO can use this

functionality despite BCP for EO system is activated.

3.1.1 Unavailability identification and notification

Actor Actions to be taken by actors Timeframe for actions

Relevant EO

EO using IT service provider services can empower IT service provider to notify

EO system unavailability in EUCTP. Legal obligation to lodge ENS, respond to

referral requests etc. remain on EO itself and empowerment of IT service

provider does not absolve EO from responsibility in case IT service provider

has not notified unavailability of EO system.

When

necessary

1 STP can be used to get DNL and referral request notifications in case of EO system and TAPAS unavailability. EO should

manually activate this option in STI-STP Manage preferences tab.

Send ENS

Register

and send

MRN

Lifecycle

validation Referrals Assessment Complete DNL Arrival Presentation Controls

3 0 0 3 2 2 2 0 1

CAPABILITIES

IT Component

EO System

Business continuity plan ICS2

Date: 28/07/2023 10 / 31 Doc. Version: 1.20

Once the EO has detected an unavailability in its system or system

components having impact on operations continuity, the unavailability has to

be notified by using EUCTP. This can be done by EO or IT service provider (if

EO is using IT service provider services) . Nevertheless, EO should ensure that

information on unavailability is not duplicated in EUCTP. EO can indicate one

or several MS which should be notified about system unavailability. In

response it gets notification via EUCTP on successful reception of information.

The unavailability notification has to be sent within 30 minutes from moment

when unavailability was detected and it has to contain all the details as

elaborated in [3.6.1].

< 30 min

IT Service

provider

Only in cases when EO has empowered its IT Service provider to notify

unavailability, IT service provider in case of its system unavailability can notify

it on behalf of EO by using EUCTP [3.6.1] in accordance with agreements

reached between EO and IT service provider.

IT service provider can indicate one or several MS which should be n otified

about system unavailability in case only one EO is impacted. If IT service

provider will notify unavailability of several EOs at the same time all MS will

receive e-mail notification.

< 30 min

Impacted

NSD

The NSD of MS that are to be notified w ill immediately receive e -mail

notification on EO system unavailability [3.6.6].

Information on EO system unavailability should be disseminated to MS users.

asap

3.1.2 Activation of Business continuity plan

Actor Actions to be taken by actors Timeframe for actions

MS via MON&BS If the EO system is not restored within 30 min utes since

unavailability was reported (corresponding recovery notification is

not sent via EUCTP) by EO or empowered IT service provider the

business continuity plan is automatically activated by MON&BS for

those MSs that were indicated as impacted in section 3.1.1.

Date/time of

unavailability

notification + 30

min

Impacted NSD Get e-mail notification on activation of BCP [3.6.6] and disseminate

it to MS users.

asap

Impacted EO and IT

service provider

Get notification via EUCTP on activation of BCP [3.6.5]. asap

3.1.3 Business continuity measures

Step in a business

process BCP measure for EO

BCP measure – Lodgement of new ENS

ENS filings No new ENS filings will be lodged during the unavailability of the component by

using EO system.

New ENS filings can be lodged during the unavailability of the component via STP.

EO is free to choose whether to use STP functionality or not to lodge new ENSs.

Amendment No amendments will be done on the already lodged ENSs via EO system.

ENS lodged via STP can still be amended via STP.

Invalidation Invalidation of ENS will not be performed by using EO system.

ENS lodged via STP can still be invalidated via STP.

Business continuity plan ICS2

Date: 28/07/2023 11 / 31 Doc. Version: 1.20

BCP measure – Risk assessment of already lodged ENSs

Referral requests (RFI,

RFS) to the EO

Receive via STP or via alternative communication channels – e-mail, phone, etc. in

case of STP unavailability.

Referral responses from

the EO Communicate via alternative communication channels – e-mail, phone, etc.

DNL Receive via STP and via phone and e-mail.

Assessment complete

notification Cannot receive during component unavailability.

Advance control

notification to AEO Receive via alternative communication channels – e-mail, phone, etc.

BCP measure – Arrival notification

Arrival notification

Lodge via STP or NES (ANES) of COFE (if that particular COFE provide a national

arrival system).

No new arrival notificati on will be lodged via EO system during EO system

unavailability.

Control notification Is received via NES (ANES) and/or via alternative communication channels – NES (ANES), NES (PNES), e-mail, phone, etc.

BCP measure – Presentation and controls

Presentation

information

No impact if ENS has been lodged and EO has received ENS registration response

– presentation is not in the scope of ICS2 and should be done via NES (PNES). If

ENS is not lodged at the moment of presentation of the consignments to customs

EO should follow instructions provided by customs.

Controls and control

results No impact.

3.1.4 Recovery communication

Actor Actions to be taken by actor Timeframe for actions

Impacted EO or IT

Service provider

Once the EO system has been restored this has to be notified by the

actor who notified this unavailability by using EUCTP [3.6.2]. After

automatic deactivation of BCP in response in response both EO and

where applicable IT service provider will receive notification via

EUCTP on deactivation of BCP [3.6.5].

asap

Impacted NSD Get e-mail notification on EO system recovery and deactivation of BCP [3.6.6]. NSD disseminate it to MS users. asap

3.1.5 Recovery measures

Component Actions to be taken by actors

EO system

EO has to lodge ENS filings for all the consignments that have not yet been lodged

during EO system unavailability.

EO can amend and invalidate the ENS filings via EO system which are not yet in the state

‘Presented’ or later state.

EO has to provide referral responses that have been provided via alternative

communication channels retroactively.

EO can waive lodgement of arrival notification in case of carrier intend s to unload all

the consignments of particular ENS from the means of transport and present it to the

COFE. If this is not the case and some consignments remain on board of the means of

Business continuity plan ICS2

Date: 28/07/2023 12 / 31 Doc. Version: 1.20

transport to be dispatched to MS of destination or MS of unloading arrival notification

should be lodged. If EO has presented consignments to customs before component has

been recovered it is possible that EO will receive IE3N07 message after recovery of the

component as consignments are already in state ‘Presented’ or later state.

The messages need to be sent in quantities (not more than 400 messages per second)

in order not to disrupt the regular performance of the TI due to abnormally high levels.

The messages must be distributed in accordance with the assigned priority in the

section 3.5.

ICS2 Central

components

The TI needs to re -send the messages to the EO for which the delivery was not

confirmed by the technical protocol.

ICS2 National

components Risk analysis/e-screening is performed on the provided ENSs even if with a delay.

Business continuity plan ICS2

Date: 28/07/2023 13 / 31 Doc. Version: 1.20

3.2 TI unavailability

3.2.1 UUM&DS Central component unavailability

Table 6 UUM&DS unavailability

Figure 2 Business continuity plan activation timeline for UUM&DS component

The unavailability of the UUM&DS services prevents the system from identifying and authenticating the sender

of a message. The messages submitted via EO system are rejected with an error message [R04] and it is not

possible to authenticate STI and STP users. Consequently, the business process does not continue and messages

are not registered, further processed and responded. Nevertheless, in case of UUM&DS unavailability EO can

still receive messages via EO system addressed to him.

The UUM&DS component is considered unavailable in the case of the failover domain activation failure.

Nevertheless, the UUM&DS central component information is cached in TAPAS for 24 hours. In case of

UUM&DS Central component unavailability an Economic Operator can send a message by using EO system

within 24 hours from the moment the last message was accepted by STI. Therefore, those EOs using EO system

can continue to exchange messages even if BCP has been activated.

3.2.1.1 Unavailability identification and notification

Actor Actions to be taken by actors Timeframe for actions

CSD The CSD records unavailability in MON&BS [3.6.3].

The unavailability has to be recorded in MON&BS within 30 minutes from

the moment unavailability was detected.

< 30 min

All NSDs The NSD of each MS gets e-mail notification on reported unavailability [3.6.6]

and notifies unavailability to MS users.

asap

EO and IT

service

provider

All EOs (including IT service provider) having access to EUCTP get notification

in it that particular ICS2 component is unavailable [3.6.5].

asap

3.2.1.2 Activation of Business continuity plan

Actor Actions to be taken by actors Timeframe for actions

MS via

MON&BS

If the UUM&DS Central component is not restored within 30 min utes since

unavailability was reported by CSD (corresponding recovery notification is

not recorded in MON&BS) the business continuity plan is automatically

activated by MON&BS.

Date/time of

unavailability

notification +

30 min

Send ENS

Register

and send

MRN

Lifecycle

validation Referrals Assessment Complete DNL Arrival Presentation Controls

2 0 0 2 0 0 2 0 0

2 0 0 2 0 0 2 0 0

CAPABILITIES

IT Component

TI UUM&DS

Central Component

National Component

Business continuity plan ICS2

Date: 28/07/2023 14 / 31 Doc. Version: 1.20

All NSDs Get e-mail notification on activation of BCP [3.6.6] and disseminate it to MS

users.

asap

EO and IT

service

provider

All EOs (including IT service provider s) having access to EUCTP get

notification within EUCTP on activation of BCP [3.6.5].

asap

3.2.1.3 Business continuity measures

Step in a business

process BCP measure for EO

BCP measure – Lodgement of new ENS

ENS filings Authentication information is cached in TAPAS for 24 hours since the last

message was sent from EO system to STI. Therefore, some EO system users

could still be able to lodge ENSs for certain period of time.

EO that is STP user and EO that has n ot sent any message via its EO system

within the last 24 hours will not be able to lodge new ENS during the

unavailability of the component via EO system and STP.

Amendment Some EO system users could be able to lodge amendments for certain period

of time.

EO that is STP user and EO that has not sent any message via its EO system

within the last 24 hours will not be able to lodge new amendments during

the unavailability of the component via EO system and STP.

Invalidation Some EO system users could be able to lodge invalidation requests for

certain period of time.

EO that is STP user and EO that has not sent any message via its EO system

within the last 24 hours will not be able to lodge invalidation request during

the unavailability of the component via EO system and STP.

BCP measure – Risk assessment of already lodged ENSs

Referral requests (RFI, RFS)

to the EO

Receive via EO system and alternative communication channels – e-mail,

phone, etc.

EO that is STP user will receive referral request via alternative

communication channels – e-mail, phone, etc. and in STP after recovery of

UUM&DS.

Referral responses from the

EO

Send via EO system where still possible or communicate via alternative

communication channels – e-mail, phone, etc.

DNL Receive via EO system and via phone and e-mail.

Assessment complete

notification

Receive via EO system or receive it with delay in STP.

Advance control notification

to AEO

Receive via EO system or alternative communication channels – NES (PNES),

e-mail, phone, etc.

BCP measure – Arrival notification

Arrival notification Submit via EO system or NES (ANES) of COFE (if that particular COFE provide

a national arrival system).

EO that is STP user or EO that has not sent via EO system any message within

the last 24 hours will not be able to lodged new arrival notification during

the unavailability of the component via EO system and STP.

Control notification Receive via EO system or alternative communication channels – NES (ANES),

NES (PNES), e-mail, phone, etc.

Business continuity plan ICS2

Date: 28/07/2023 15 / 31 Doc. Version: 1.20

BCP measure – Presentation and controls

Presentation information No impact if ENS has been lodged and EO has received ENS registration

response – presentation is not in the scope of ICS2 and should be done via

NES (PNES). If ENS is not lodged at the moment of presentation of the

consignments to customs EO should follow instructio ns provided by

customs.

Controls and control results No impact.

3.2.1.4 Recovery communication

Actor Actions to be taken by actor Timeframe for actions

CSD When component has been recovered the CSD updates unavailability

record in MON&BS by indicating unavailability end date/time [3.6.4]. BCP

is automatically deactivated.

asap

All NSDs Get e -mail notification on UUM&DS Central component recovery and

deactivation of BCP [3.6.6]. NSD disseminate it to MS users.

asap

EO and IT

service

provider

All EOs (including IT service provider s) having access to EUCTP get

notification within EUCTP on deactivation of BCP [3.6.5]. asap

3.2.1.5 Recovery measures

Component Actions to be taken by actors

EO system,

STP

EO has to lodge ENS filings for all the consignments that have not yet been lodged during

UUM&DS central component unavailability.

EO can amend and invalidate the ENS filings which are not yet in the state ‘Presented’ or

later state.

EO has to provide referral responses that have been provided via alternative

communication channels.

EO can waive lodgement of arrival notification in case of carrier intend to unload all the

consignment of particular ENS from the means of transport and present it in the COFE. If

this is not the case and some consignments remain on board of means of transport to be

dispatched to MS of destination or MS of unloading arrival notification should be lodged.

If you have presented consignments to customs before component has been recovered it

is possible that you will receive IE3N07 message after recovery o f the component as

consignments are already in state ‘Presented’ or later state.

The messages need to be sent in quantities (not more than 400 messages per second) not

to disrupt the regular performance of the TI due to abnormally high levels. The messag es

must be distributed in accordance with the assigned priority.

ICS2 National

component

Risk analysis/e-screening is performed to the provided ENSs even if with a delay.

Business continuity plan ICS2

Date: 28/07/2023 16 / 31 Doc. Version: 1.20

3.2.2 UUM&DS National component unavailability

Table 7 UUM&DS unavailability

Figure 3 Business continuity plan activation timeline for UUM&DS component

The unavailability of UUM&DS National component will prevent the system from identifying and authenticating

the sender of a message. The messages submitted via EO system are rejected with an error message and it is

not possible to authenticate STI and STP users. Consequently, the business process does not continue and

messages are not registered, further processed and responded. Nevertheless, in case of UUM&DS unavailability

EO can still receive messages via EO system addressed to him.

The UUM&DS national c omponent is considered unavailable in the case of the failover domain activation

failure.

3.2.2.1 Unavailability identification and notification

Actor Actions to be taken by actors Timeframe for actions

NSD

The impacted NSD of the affected MS records unavailability in MON&BS

[3.6.3].

The unavailability notification has to be recorded in MON&BS within 30

minutes from the moment unavailability was detected.

< 30 min

All NSDs NSD of each MS gets e-mail notification on reported unavailability [3.6.6]

and notifies unavailability to MS users.

asap

EO and IT

service

provider

All EOs (including IT service provider) having access to EUCTP get

notification in it that particular ICS2 component is unavailable [3.6.5].

asap

3.2.2.2 Activation of Business continuity plan

Actor Actions to be taken by actors Timeframe for actions

MS via

MON&BS

If the UUM&DS National component is not restored within 30 min utes

since unavailability was reported by N SD (corresponding recovery

notification is not recorded in MON&BS) the business continuity plan is

automatically activated by MON&BS.

Date/time of

unavailability

notification + 30

min

All NSDs Get e-mail notification on activation of BCP [3.6.6] and disseminate it to

MS users.

asap

Send ENS

Register

and send

MRN

Lifecycle

validation Referrals Assessment Complete DNL Arrival Presentation Controls

2 0 0 2 0 0 2 0 0

2 0 0 2 0 0 2 0 0

CAPABILITIES

IT Component

TI UUM&DS

Central Component

National Component

Business continuity plan ICS2

Date: 28/07/2023 17 / 31 Doc. Version: 1.20

EO and IT

service

provider

All EOs (including IT service provider) having access to EUCTP get

notification in EUCTP on activation of BCP [3.6.5].

asap

3.2.2.3 Business continuity measures

Step in a business

process BCP measure for EO

BCP measure – Lodgement of new ENS

ENS filings No new ENS filings can be lodged.

Amendment No new ENS amendments can be lodged.

Invalidation Invalidation of ENS will not be performed.

Risk assessment of already lodged ENSs

Referral requests (RFI,

RFS) to the EO

Receive via EO system and alternative communication channels – e-mail,

phone, etc.

EO that is STP user will receive referral request via alternative communication

channels – e-mail, phone, etc. and in STP after recovery of UUM&DS.

Referral responses from

the EO

Communicate via alternative communication channels – e-mail, phone, etc.

DNL Receive via EO system and/or via phone and e-mail.

Assessment complete

notification

Receive via EO system or receive it with delay in STP.

Advance control

notification to AEO

Receive via EO system or alternative communication channels – NES (PNES),

e-mail, phone, etc.

BCP measure – Arrival notification

Arrival notification Submit via EO system or NES (ANES) of COFE (if that particular COFE provide a

national arrival system).

EO will not be able to lodge new arrival notification during the unavailability

of the component via EO system and STP.

Control notification Receive via EO system or alternative communication channels – NES (ANES),

NES (PNES), e-mail, phone, etc.

BCP measure – Presentation and controls

Presentation information No impact if ENS has been lodged and EO has received ENS registration

response – presentation is not in the scope of ICS2 and should be done via NES

(PNES). If ENS is not lodged at the moment of presentation of the

consignments to customs EO should follow instructions provided by customs.

Controls and control

results

No impact.

3.2.2.4 Recovery communication

Actor Actions to be taken by actor Timeframe for actions

NSD

The impacted NSD updates unavailability record in MON&BS by

indicating unavailability end date/time [3.6.4].

asap

All NSDs Get e-mail notification on UUM&DS National component recovery and deactivation of BCP [3.6.6]. NSD disseminate it to MS users. asap

Business continuity plan ICS2

Date: 28/07/2023 18 / 31 Doc. Version: 1.20

EO and IT service

provider

All EOs (including IT service provider) having access to EUCTP get

notification in EUCTP on deactivation of BCP [3.6.5]. asap

3.2.2.5 Recovery measures

Component Actions to be taken by actors

EO system, STP

EO has to lodge ENS filings for all the consignments that have not yet been lodged

during UUM&DS national component unavailability.

EO can amend and invalidate the ENS filings which are not yet in the state ‘Presented’

or later state.

EO has to provide referral responses that have been provided via alternative

communication channels.

EO can waive lodgement of arrival notification in case of carrier intend to unload the

consignment of particular ENS from the means of transport and present it in the

COFE. If this is not the case and some consignments remain on board of means of

transport to be dispatched to MS of destination or MS of unloading arrival notification

should be lodged. If EO has presented consignments to customs before component

has been recovered it is possible that EO will receive IE3N07 message after recovery

of the component as consignments are already in state ‘Presented’ or later state.

The messages need to be sent in quantities (not more than 400 messages per second)

not to disrupt the regular performance of the TI due to abnormally high levels. The

resulting traffic should not exceed limits agreed on technical protocol. The messages

must be distributed in accordance with the assigned priority.

ICS2 National

components

Risk analysis/e-screening is performed to the provided ENSs even if with a delay.

Business continuity plan ICS2

Date: 28/07/2023 19 / 31 Doc. Version: 1.20

3.2.3 TAPAS unavailability

Table 8 TAPAS unavailability

Figure 4 Business continuity plan activation timeline for TAPAS component

TAPAS is considered to be unavailable when it cannot interact as per the specifications regardless of the reason.

TAPAS unavailability can be compensated (alternatively handled) by STP without impact on the operations

continuity. For EO there is no reason to apply BCP measures if STP functionality can be used to ensure

operations continuity.

3.2.3.1 Unavailability identification and notification

Actor Actions to be taken by actors Timeframe for actions

CSD The CSD records unavailability in MON&BS [3.6.3].

The unavailability notification has to be recorded within 30 minutes from

the moment when unavailability was detected.

< 30 min

All NSDs The NSD of each MS gets e -mail notification on reported unavailability

[3.6.6] and notifies unavailability to MS users.

asap

EO and IT

service

provider

All EOs (including IT service provider) having access to EUCTP get

notification in it that particular ICS2 component is unavailable [3.6.5].

asap

3.2.3.2 Activation of Business continuity plan

Actor Actions to be taken by actors Timeframe for actions

MS via

MON&BS

If the TAPAS is not restored within 30 minutes since unavailability was

reported by CSD (corresponding recovery notification is not recorded in

MON&BS) the business continuity plan is automatically activated by

MON&BS.

Date/time of

unavailability

notification + 30

min

All NSDs Get e-mail notification on activation of BCP [3.6.6] and disseminate it to MS

users.

asap

EO and IT

service

provider

All EOs (including IT se rvice provider) having access to EUCTP get

notification in EUCTP on activation of BCP [3.6.5].

asap

Send ENS

Register

and send

MRN

Lifecycle

validation Referrals Assessment Complete DNL Arrival Presentation Controls

3 0 0 3 3 3 2 0 1

CAPABILITIES

IT Component

TI TAPAS

Business continuity plan ICS2

Date: 28/07/2023 20 / 31 Doc. Version: 1.20

3.2.3.3 Business continuity measures

Step in a business

process BCP measure for EO

BCP measure – Lodgement of new ENS

ENS filings No new ENS filings will be lodged during the unavailability of the component

by using EO system.

New ENS filings can be lodged during the unavailability of the component via

STP. EO is free to choose whether to use STP functionality or not to lodge

new ENSs.

Amendment No amendments will be done on the already lodged ENSs via EO system.

Only ENS lodged via STP can be amended via STP.

Invalidation Invalidation of ENS will not be performed via EO system.

Only ENS lodged via STP can be invalidated via STP.

BCP measure – Risk assessment of already lodged ENSs

Referral requests (RFI, RFS) to

the EO

Receive via STP.

Referral responses from the

EO

Communicate via alternative communication channels – e-mail, phone, etc.

DNL Receive via STP and via phone and e-mail.

Assessment complete

notification

Receive via STP for ENSs lodged via STP.

Cannot receive during component unavailability for ENSs lodged via EO

system.

Advance control notification

to AEO

Receive via STP for ENSs lodged via STP.

Receive via alternative communication channels – e-mail, phone, etc.

BCP measure – Arrival notification

Arrival notification Lodge via STP or NES (ANES) of COFE (if that particular COFE provide a

national arrival system).

If it is not possible to l odge via STP or NES (ANES) of COFE , lodge via EO

system. Arrival notification will be queued and processed after recovery of

the compon ent. If you have presented consignments to customs before

component has been recovered it is possible that you will receive IE3N07

message after recovery of the component as consignments are already in

state ‘Presented’ or later state.

Control notification Received via STP , NES (ANES) or via alternative communication channels –

NES (PNES), e-mail, phone, etc.

BCP measure – Presentation and controls

Presentation information No impact if ENS has been lodged and EO has received ENS registration

response – presentation is not in the scope of ICS2 and should be done via

NES (PNES). If ENS is not lodged at the moment of presentation of the

consignments to customs EO should follow instructions provided by

customs.

Controls and control results No impact.

Business continuity plan ICS2

Date: 28/07/2023 21 / 31 Doc. Version: 1.20

3.2.3.4 Recovery communication

Actor Actions to be taken by actor Timeframe for actions

CSD When component has been recovered the CSD updates unavailability

record in MON&BS by indicating unavailability end date and time

[3.6.4]. BCP is automatically deactivated.

asap

All NSDs Get e -mail notification on TAPAS recovery and deactivation of BCP

[3.6.6]. NSD disseminate it to MS users.

asap

EO and IT

service provider

All EOs (including IT service provider) having access to EUCTP get

notification in EUCTP on deactivation of BCP [3.6.5]. asap

3.2.3.5 Recovery measures

Component Actions to be taken by actors

EO system

EO has to lodge ENS filings for all the consignments that have not yet been lodged during

EO system unavailability.

EO can amend and invalidate the ENS filings via EO system which are not yet in the state

‘Presented’ or later state.

EO has to provide referral responses that have been provided via alternative

communication channels.

EO can waive lodgement of arrival notification in case if carrier intend to unload the

consignment of particular ENS from the means of transport and present it in the COFE. If

this is not the case and some consignments remain on board of means of transport to be

dispatched to MS of destination or MS of unloading arrival notification should be lodged.

If you have presented consignments to customs before component has been recovered it

is possible that you will receive IE3N07 message after recover y of the component as

consignments are already in state ‘Presented’ or later state.

The messages need to be sent in quantities (not more than 400 messages per second) not

to disrupt the regular performance of the TI due to abnormally high levels. The messages

must be distributed in accordance with the assigned priority in the section 3.5.

ICS2 Central

components

The TI needs to re-send the messages to the EO for which the delivery was not confirmed

by the technical protocol.

ICS2 National

components

Risk analysis/e-screening is performed to the provided ENSs even if with a delay.

Business continuity plan ICS2

Date: 28/07/2023 22 / 31 Doc. Version: 1.20

3.2.4 STI (including STP) unavailability

Table 9 STI unavailability

Figure 5 Business continuity plan activation timeline for STI component

No message exchange between the Economic Operators and the STI (STP) can take place. Economic Operators

are not able to use STP functionality to exchange any ICS2 messages.

In case of unavailability of the STI (STP) , no mes sages from the Economic Operators will be functionally

validated, registered and further processed. Moreover, no messages are sent to the Economic Operators for

the ENSs which are already in process. The messages received from the EO system are stored and queued in

TAPAS and can be processed when STI is available again. There is no need for the Economic Operators to re -

send those messages. The outgoing STI message s are queued but not sent. The operations performed by the

STI are completely blocked – no MRNs are generated and communicated.

STP is available to economic operators as of ICS2 Release 2.

3.2.4.1 Unavailability identification and notification

Actor Actions to be taken by actors Timeframe for actions

CSD The CSD records unavailability in MON&BS [3.6.3].

The unavailability notification has to be recorded within 30 minutes from

the moment unavailability was detected.

< 30 min

All NSDs The NSD of each MS gets e -mail notification on reported unavailability

[3.6.6] and notifies unavailability to MS users.

asap

EO and IT

service

provider

All EOs (including IT service provider) having access to EUCTP get

notification in it that particular ICS2 component is unavailable [3.6.5].

asap

3.2.4.2 Activation of Business continuity plan

Actor Actions to be taken by actors Timeframe for actions

MS via

MON&BS

If the STI (STP) is not restored within 30 minutes since unavailability was

reported by CSD (corresponding recovery notification is not recorded in

MON&BS) the business continuity plan is automatically activated by

MON&BS.

Date/time of

unavailability

notification + 30

min

Send ENS

Register

and send

MRN

Lifecycle

validation Referrals Assessment Complete DNL Arrival Presentation Controls

0 3 0 3 3 3 2 0 1

3 3 0 3 3 3 2 0 1

STI

STI

STP

CAPABILITIES

IT Component

TI

Business continuity plan ICS2

Date: 28/07/2023 23 / 31 Doc. Version: 1.20

All NSDs Get e-mail notification on activation of BCP [3.6.6] and disseminate it to

MS users.

asap

EO and IT

service

provider

All EOs (including IT service provider s) having access to EUCTP get

notification within EUCTP on activation of BCP [3.6.5].

asap

3.2.4.3 Business continuity measures

Step in a business

process BCP measure for EO

BCP measure – Lodgement of new ENS

ENS filings New ENS filings can be lodged via EO system. MRN for that ENS filing will be

generated upon recovery of the component.

If the message load is too large the NSD may request EO to delay sending of the

messages.

No new ENS filings can be lodged via STP.

Amendment Amendments of the ENSs can be lodged via EO system, but already lodged ENSs

will not be amended until the system is restored.

No new ENS amendments can be lodged via STP.

Invalidation Invalidation of ENS can be requested via EO system but will not be performed until

the system is restored.

Invalidation of ENS will not be performed via STP.

BCP measure – Risk assessment of already lodged ENSs

Referral requests (RFI,

RFS) to the EO

Receive via alternative communication channels – e-mail, phone, etc.

Referral responses from

the EO

Responses to the referral requests received before unavailability of STI should be

sent via EO system and/or via alternative communication channels – e-mail,

phone, etc.

Responses to the referral requests received during unavailability of STI should be

sent via alternative communication channels – e-mail, phone, etc.

DNL Receive via phone and e-mail.

Assessment complete

notification

Is not sent to the EO system during the unavailability of STI. Receive with the

delay.

Advance control

notification to AEO

Receive via alternative communication channels – e-mail, phone, etc.

BCP measure – Arrival notification

Arrival notification Lodge via NES (ANES) of COFE (if that particular COFE provide a national arrival

system).

If it is not possible to l odge via NES (ANES) of COFE , lodge via EO system. Arrival

notification will be queued and processed after recovery of the component. If you

have presented consignments to customs before component has been recovered

it is possible that you will receive IE3N07 message after recovery of the

component as consignments are already in state ‘Presented’ or later state.

If it is not possible to lodge via NES (ANES) of COFE and via EO system, lodgement

of arrival notification can be waived in case of carrier intend to unload all the

consignment of particular ENS from the means of transport and present it in the

COFE. If this is not the case and some consignments remain on board of means of

Business continuity plan ICS2

Date: 28/07/2023 24 / 31 Doc. Version: 1.20

transport to be dispatched to MS of destination or MS of unloading arrival

notification should be lodged with the delay.

Control notification Receive via NES (ANES) or alternative communication channels – NES (PNES), e -

mail, phone, etc.

BCP measure – Presentation and controls

Presentation

information

No impact if ENS has been lodged and EO has received ENS registration response

– presentation is not in the scope of ICS2 and should be done via NES (PNES). If

ENS is not lodged at the moment of presentation of the consignments to customs

EO should follow instructions provided by customs.

Controls and control

results

No impact.

3.2.4.4 Recovery communication

Actor Actions to be taken by actor Timeframe for actions

CSD When component has been recovered the CSD updates unavailability record

in MON&BS by indicating unavailability end date/ time [3.6.4]. BCP is

automatically deactivated.

asap

All NSDs Get e-mail notification on STI recovery and deactivation of BCP [3.6.6]. NSD

disseminate it to MS users.

asap

EO and IT

service

provider

All EOs (including IT service provider s) having access to EUCTP get

notification within EUCTP on deactivation of BCP [3.6.5]. asap

3.2.4.5 Recovery measures

Component Actions to be taken by actors

EO system, STP

EO has to lodge ENS filings for all the consignments that have not yet been lodged via

EO system or STP during STI (STP) unavailability. EO does not need to resend ENS filings

that has been sent to STI via EO system – these messages are queued and will be

processed after STI (STP) recovery.

EO can amend and invalidate the ENS filings that are not in state "Presented" or later

state. If amendment or invalidation was already requested via EO system during the

unavailability of STI (STP), no further actions from the EO are needed.

EO has to provide referral responses via EO system or STP that have been provided via

alternative communication channels only. If referral responses were submitted via the

EO system and alternative communication channels during the STI (STP) unavailability,

no further actions from the EO are needed.

EO can waive lodgement of arrival notification in case of carrier intend to unload the

consignment of particular ENS from the means of transport and present it in the COFE.

If this is not the case and some consignments remain on board of means of transport

to be dispatched to MS of destination or MS of unloading arrival notification should be

lodged. If EO has presented consignments to customs before component has been

recovered it is possible that EO will receive IE3N07 message after recovery of the

component as consignments are already in state ‘Presented’ or later state.

The messages need to be sent in quantities (not more than 400 messages per second)

in order not to disrupt the regular performance of the TI due to abnormal high levels.

The resulting traffic should not exceed limits agreed on technical protocol. The

messages must be distributed in accordance with the assigned priority (please see

section 3.5).

ICS2 Central

components

The TI needs to re -send the messages to the EO for which the delivery was not

confirmed by the technical protocol.

Business continuity plan ICS2

Date: 28/07/2023 25 / 31 Doc. Version: 1.20

ICS2 National

components

Risk analysis/e-screening is performed to the provided ENSs even if with a delay.

3.3 ICS2 Common and/or ICS2 National component unavailability

Table 10 ICS2 Common and/or ICS2 National component unavailability

Figure 6 Business continuity plan activation timeline for ICS2 Common and/or ICS2 National component

All received messages will be queued during unavailability of component and processed after recovery.

The ENS filings will be validated by STI, registered, but it could have impact to ENS life cycle validation in some

cases EO won’t be informed on MRN and no risk analysis will be triggered/performed. The arrival notifications

submitted via EO system or STP will be validated by STI, registered, but it could have impact to consignment

state correctness checks and generation of MRN.

Communication between customs and EO on the ongoing risk analysis process, referrals and results of it via

the system is not possible.

3.3.1 Unavailability identification and notification

Actor Actions to be taken by actors Timeframe for actions

CSD The CSD records ICS2 Common component unavailability in MON&BS [3.6.3].

The unavailability notification has to be recorded within 30 minutes after

unavailability was detected.

< 30 min

NSD The impacted NSD records ICS2 National component unavailability in

MON&BS [3.6.3].

The unavailability notifica tion has to be recorded within 3 0 minutes after

unavailability was detected.

< 30 min

All NSDs The NSD of each MS gets e-mail notification on reported unavailability [3.6.6]

and notifies unavailability to MS users.

asap

EO and IT

service

provider

All EOs (including IT service provider) having access to EUCTP get notification

on ICS2 Common component and/or ICS2 National component unavailability

[3.6.5]. It is not disc losed to EOs which of above -mentioned components is

unavailable.

asap

Send ENS

Register

and send

MRN

Lifecycle

validation Referrals Assessment Complete DNL Arrival Presentation Controls

0 0 3 3 3 3 3 3 3

0 0 0 2 0 0 2 3 3ICS2 National components

ICS2 Common components

CAPABILITIES

IT Component

Business continuity plan ICS2

Date: 28/07/2023 26 / 31 Doc. Version: 1.20

3.3.2 Activation of Business continuity plan

Actor Actions to be taken by actors Timeframe for actions

MS via

MON&BS

If the ICS2 Common component and/or ICS2 National component is not

restored within 30 minutes since unavailability was reported by CSD or

NSD (corresponding recovery notification is not recorded in MON&BS)

the business continuity plan is automatically activated by MON&BS.

Date/time of

unavailability

notification + 30

min

All NSDs Get e-mail notification on activation of BCP [3.6.6] and disseminate it to

MS users.

asap

EO and IT

service provider

All EOs (including IT service provider) having access to EUCTP get

notification within EUCTP on activation of BCP [3.6.5].

asap

3.3.3 Business continuity measures

Step in a business

process BCP measure for EO

BCP measure – Lodgement of new ENS

ENS filings No impact – lodge ENS filing via EO system and/or STP.

Amendment No impact – amend via EO system and/or STP.

Invalidation No impact – invalidate via EO system and/or STP.

BCP measure – Risk assessment of already lodged ENSs

Referral requests (RFI,

RFS) to the EO

Receive via alternative communication channels – e-mail, phone, etc.

Referral responses from

the EO

Referral response to already received referral request should be sent via EO

system or STP and in addition , need to be communicated via alternative

communication channels – e-mail, phone, etc.

Referral response to the request issued via alternative communication channels

need to be communicated via alternative communication channels.

DNL Receive via phone and e-mail.

Assessment complete

notifications

It is possible that during unavailability EO receives both assessment complete

and DNL. If this is the case priority is with DNL.

Advance control

notification to AEO

Receive via alternative communication channels – NES (PNES), e -mail, phone,

etc.

BCP measure – Arrival notification

Arrival notification Lodge via EO system, STP or NES (ANES) of COFE (if that particular COFE provide

a national arrival system):

 Arrival notification lodged via EO system or STP will be queued and

processed after recovery of the component;

 Arrival notification lodged via NES (ANES) can be processed and the

person notifying the arrival can get arrival registration response.

Nevertheless, if EO has presented consignments to customs before component

has been recovered it is possible that it will receive IE3N07 message after

Business continuity plan ICS2

Date: 28/07/2023 27 / 31 Doc. Version: 1.20

recovery of the component as consignments are already in state ‘Presented’ or

later state.

Control notification Receive via alternative communication channels – NES (PNES), e -mail, phone,

etc.

BCP measure – Presentation and controls

Presentation information No impact if ENS has been lodged and EO has received ENS registration response

– presentation is not in the scope of ICS2 and should be done via NES (PNES). If

ENS is not lodged at the moment of presentation of the consignments to

customs EO should follow instructions provided by customs.

Control results No impact.

3.3.4 Recovery communication

Actor Actions to be taken by actor Timeframe for actions

CSD When ICS2 Common component has been recovered the CSD updates

unavailability record in MON&BS by indicating unavailability end date/time

[3.6.4]. BCP is automatically deactivated.

asap

NSD When ICS2 National component has been recovered the N SD updates

unavailability record in MON&BS by indicating unavailability end date/time

[3.6.4]. BCP is automatically deactivated.

asap

All NSDs Get e -mail notification on ICS2 Common component and ICS2 National

component recovery and deactivation of BCP [3.6.6]. NSD disseminate it to

MS users.

asap

EO and IT

service

provider

All EOs (including IT service provider) having access to EUCTP get notification

in EUCTP on deactivation of BCP [3.6.5]. asap

3.3.5 Recovery measures

Component Actions to be taken by actors

EO system, STP Referral responses that have been provided only via alternative communication

channels have to be sent via the system (EO system or STP) upon reception of

corresponding referral request.

ICS2 Central

components

Once the component is recovered, the message queues will be processed. There is no

need for EO to re-send the messages.

The sequence of message processing is based on priority defined in section 3.5.

ICS2 National

component

Risk analysis/e-screening is performed to the provided ENSs even if with a delay.

Business continuity plan ICS2

Date: 28/07/2023 28 / 31 Doc. Version: 1.20

3.4 MON&BS and EUCTP unavailability

3.4.1 MON&BS unavailability

In case of MON&BS unavailability it won’t be possible to record unavailability, recovery and/or (de)activate BCP

for ICS2 components . In that case EO (including IT service provider), NSD and CSD should revert to e -mail

communication. Rollback to e-mail procedure can be done by CSD and NSD:

 as soon as MON&BS is unavailable in case of scheduled unavailability;

 as soon as CSD has notified NSDs on unscheduled unavailability of MON&BS.

The principles who should notify unavailability remain the same as describ ed in this document with the

following deviations:

 EO (or IT service provider) should notify EO system unavailability and later recovery of the system to

NSD of MS where EO has:

o legal obligation to lodge ENS and arrival notification;

o already lodged ENS but it has not received assessment complete messages after both pre -

loading and pre-arrival RA.

 NSD should:

o communicate ICS2 central and national component unavailability /recovery information to

EOs;

o communicate ICS2 national component unavailability/recovery information to CSD;

o activate BCP for all ICS2 components and communicate it to EOs and CSD (if ICS2 component

has not recovered within 30 min since unavailability was notified);

o deactivate BCP for all ICS2 components and communicate it to EOs and CSD.

 CSD should:

o communicate ICS2 central component unavailability/recovery to all NSDs;

o forward ICS2 national component unavailability /recovery information received from NSD to

all other NSDs.

Upon recovery, unavailability notified within the manual procedure and information on (de) activation of BCP

should be recorded in MON&BS. This is done by:

 NSD for EO system and ICS2 national component unavailability, or

 CSD for ICS2 central component unavailability.

3.4.2 EUCTP unavailability

In case of EUCTP unavailability it won’t be possible for EO to record unavailability and recovery and get

notification on (de)activation of BCP for ICS2 components. In that case EO (including IT service provider) and

NSD should revert to e-mail communication. Rollback to e-mail procedure can be done by NSD:

 as soon as EUCTP is unavailable in case of scheduled unavailability;

 as soon as CSD has notified NSDs on unscheduled unavailability of EUCTP.

The principles who should notify unavailability remain the same as described in this document with the

following deviations:

 EO (or IT service provider) should notify EO system unavailability and later recovery of the system to

NSD of MS where EO has:

o legal obligation to lodge ENS and arrival notification;

o already lodged ENS but it has not received assessment complete messages after both pre -

loading and pre-arrival RA.

 NSD should:

o record EO system unavailability/recovery in MON&BS;

o communicate ICS2 central and national component unavailability /recovery information to

EOs;

o communicate activation of BCP for all ICS2 components to EOs;

o communicate deactivation of BCP for all ICS2 components to EOs.

Business continuity plan ICS2

Date: 28/07/2023 29 / 31 Doc. Version: 1.20

3.5 ICS2 Message prioritisation

3.5.1 External domain messages

Priority Message

ID Name Full name Process where it is used

B IE3Fxx E_ENS_xxx_DEC ENS filing L4-ICS2-01 Register filing

B IE3Axx E_ENS_xxx_AMD ENS filing amendment L4-ICS2-07 Amend filing

A IE3Q01 E_DNL_REQ Do Not Load request L4-ICS2-03 Perform risk analysis

B IE3Q02 E_REF_RFI_REQ Additional information request L4-ICS2-03-01 Send referral

A IE3Q03 E_REF_RFS_REQ High Risk Cargo & Mail screening request L4-ICS2-03-01 Send referral

C IE3Q04 E_INV_REQ Invalidation Request L4-ICS2-08 Invalidate filing

C IE3Q05 E_ENS_CNS ENS Consultation L4-ICS2-13 Consult ENS

B IE3R01 E_ENS_REG_RSP ENS Registration Response L4-ICS2-01 Register filing

B IE3R02 E_REF_RFI_RSP Additional information response L4-ICS2-03-01 Send referral

A IE3R03 E_REF_RFS_RSP High Risk Cargo & Mail screening response L4-ICS2-03-01 Send referral

B IE3R04 E_ARV_REG_RSP Arrival Registration Response L4-ICS2-04 Process arrival of means of transport

C IE3R07 E_INV_ACC_RSP Invalidation Acceptance Response L4-ICS2-08 Invalidate filing

B IE3R08 E_ENS_CNS_RES ENS Consultation results L4-ICS2-13 Consult ENS

B IE3N01 E_ELF_VLD_NOT ENS lifecycle validation error notification L4-ICS2-01 Register filing

C IE3N02 E_ENS_NCP_NOT ENS Not complete notification L4-ICS2-02-01 Relate ENS filings

A IE3N03 E_ASM_CMP_NOT Assessment complete notification L4-ICS2-03 Perform risk analysis

C IE3N04 E_REF_RFI_NOT Additional information request notification L4-ICS2-03-01 Send referral

C IE3N05 E_REF_RFS_NOT High Risk Cargo & Mail screening request notification L4-ICS2-03-01 Send referral

A IE3N06 E_ARV_NOT Arrival notification L4-ICS2-04 Process arrival of means of transport

C IE3N07 E_HCS_INC_NOT House consignment in incorrect state notification L4-ICS2-04 Process arrival of means of transport

A IE3N08 E_CON_NOT Control notification L4-ICS2-04 Process arrival of means of transport

C IE3N09 E_AEO_CON_NOT Authorised Economic Operator control notification L4-ICS2-06-01 Handle AEO notification

C IE3N10 E_AMD_NOT Amendment Notification L4-ICS2-07 Amend filing

B

IE3N99 E_ERR_NOT Error notification

L4-ICS2-01 Register filing

L4-ICS2-04 Process arrival of means of

transport

L4-ICS2-07 Amend filing

L4-ICS2-08 Invalidate filing

Business continuity plan ICS2

Date: 28/07/2023 30 / 31 Doc. Version: 1.20

3.6 Information to be provided upon unavailability reporting

and (de)activation of BCP

The main principle is that unavailability and recovery of ICS2 component is reported by economic operator

(with an option to empower IT service provider to do it on behalf of EO if EO is using IT service provider

services), CSD and NSD. Business continuity plan is activated automatically by the system.

The purpose of this section is to define information that has to be provided by involved actors upon

reporting of unavailability or recovery of ICS2 component.

3.6.1 EO – unavailability reporting:

 EORI number of Economic operator whose EO system is unavailable;

 EO name whose EO system is unavailable;

 EORI number of IT service provider – mandatory data element when unavailability is reported by

IT service provider on behalf of EO;

 E-mail address of EO or IT service provider who is notifying unavailability;

 List of MS (one or several) which should be notified about unavailability;

 Unavailability type (scheduled or unscheduled);

 Unavailability start date and time;

 Expected unavailability end date and time (optional);

 Short description on what has caused the unavailability (optional).

3.6.2 EO – recovery reporting:

 EORI number of Economic operator whose EO system is recovered;

 EO name whose EO system is recovered;

 EORI number of IT service provider – mandatory data element when recovery is reported by IT

service provider on behalf of EO;

 Unavailability end date and time.

3.6.3 CSD and NSD – unavailability reporting:

 Component name;

 Unavailability type (scheduled or unscheduled);

 Unavailability start date and time;

 Expected unavailability end date and time (optional);

 Affected service;

 Short description on what has caused the unavailability/ Affected functionality (optional).

3.6.4 CSD and NSD – recovery reporting:

 Component name;

 Unavailability end date and time.

3.6.5 Content of notifications to be sent to EO and IT service provider:

3.6.5.1 After ICS2 component unavailability is reported

All the information provided in sections 3.6.1 or 3.6.3.

3.6.5.2 In case of BCP activation

All the information provided in sections 3.6.1 or 3.6.3 and BCP activation date and time.

3.6.5.3 In case of recovery and BCP deactivation

All the information provided in sections 3.6.2 or 3.6.4 and BCP deactivation date and time.

3.6.6 Content of e-mail notifications to be sent to NSD:

3.6.6.1 After ICS2 component unavailability is reported

All the information provided in sections 3.6.1 or 3.6.3.

Business continuity plan ICS2

Date: 28/07/2023 31 / 31 Doc. Version: 1.20

3.6.6.2 In case of BCP activation

All the information provided in sections 3.6.1 or 3.6.3 and BCP activation date and time.

3.6.6.3 In case of recovery and BCP deactivation

All the information provided in sections 3.6.2 or 3.6.4 and BCP deactivation date and time.

3.7 Scheduled unavailability

MSs and CSD are going to use MON&BS to exchange information on scheduled unavailability. Scheduled

unavailability has to be organised in time windows when there is less operational activity and has to be

recorded in MON&BS as soon as possible but not later than 48 hours in advance [ R04].

EO has to notify scheduled unavailability of EO system as soon as possible but not later than 48 hours in

advance by using EUCTP. This can also be done by empowered IT service provider, but legal responsibility

to notify unavailability remain on EO himself.

In case of scheduled unavailability BCP will be automatically activated for the period when unavailability

is scheduled. All EOs (including IT service provider) having access to EUCTP get notification in EUCTP on

deactivation of BCP [3.6.5].

3.8 Transition from ICS2 Release 1 to ICS2 Release 2

This procedure is applicable as of ICS2 Release 1 nevertheless, EOs will be able to use:

 EUCTP2 to notify unavailability and get notifications only as of ICS2 Release 2 ( preliminary

planning – date when procedure will be applicable for ICS2 Release 2 will be communicated

separately)

 STP to lodge ENSs, arrival notifications and see ICS2 notifications only as of ICS2 Release 2.

Until EUCTP and STP is developed and deployed procedure is applicable with the following deviations:

 EO (or IT service provider) should notify EO system unavailability to NSD where EO has legal

obligation to lodge ENSs. EO can also empower IT service provider to do this but legal obligation

remain on EO himself;

 EO cannot use STP to send messages and get notifications therefore only alternative

communication channels can be used;

 NSD should notify EOs having l egal obligation to lodge ENSs in its country on ICS2 central and

national component unavailability;

 NSD should notify EOs having legal obligation to lodge ENSs in its country on

activation/deactivation of BCP in case of EO system, ICS2 central and/or natio nal component

unavailability;

 activation / deactivation of BCP is manual process done by each NSD .

End of document

2 DG TAXUD assumption on a tool to be used for this BCP purposes. Tool can still be changed and this BCP will be updated respectively

(if necessary).

Vprašaj pomočnika o tej strani