ICS2-BCP-EO-(2022-06-10)-v1.10_SfA PDF
Vsebina
DG TAXUD
Business continuity plan
for Economic Operators
ICS2
Date: 28/07/2023
Doc. Version: 1.20
Business continuity plan ICS2
Date: 28/07/2023 2 / 31 Doc. Version: 1.20
Document Control Information
Settings Value
Document Title: Business continuity plan for Economic Operators
Project Title: ICS2
Document Author: DG TAXUD Unit A3
Project Owner: DG TAXUD Unit A3
Doc. Version: 1.20
Sensitivity: Sensitive Non Classified
Date: 28/07/2023
Document Approver(s) and Reviewer(s):
NOTE: All Approvers are required. Records of each approver must be maintained. All reviewers in the list are
considered required unless explicitly listed as Optional.
Name Role Action Date
ECCG Approve 10.06.2022
TCG Review 04.04.2022
Document history:
The Document Author is authorized to make the following types of changes to the document without requiring
that the document be re-approved:
Editorial, formatting, and spelling
Clarification
To request a change to this document, contact the Document Autho r or Owner.
Changes to this document are summarized in the following table in reverse chronological order (latest version
first).
Revision Date Created by Short Description of Changes
1.20 28.07.2023 DG TAXUD Cross-references updated in all the
document;
Section 3.2.2 updated by removing statement
that UUM&DS national component
information is cached in TAPAS for 24 hours
and descriptions having impact of this change.
1.10 10.06.2022 DG TAXUD Document updated to implement DG TAXUD,
ECCG and TCG comments. Sent out for approval
(SfA).
1.04 08.06.2022 DG TAXUD Document updated to implement ITSM3 and
QA4 comments.
1.03 04.04.2022 DG TAXUD The following sections were updated based on
the input from the expert group held on
30.03.2022. – sections 3.4 and 3.6.1. Submitted
for review (SfR).
1.02 24.03.2022 DG TAXUD Document updated based on the input from the
expert group held on 16.02.2022 and
09.03.2022.
1.01 07.02.2022 DG TAXUD Document updated to cover ICS2 Release 1 and
ICS2 Release 2 needs. Sent out to ICS2 Expert
group for information before the second expert
group meeting planned on 16.02.2022.
1.00 11.02.2021 DG TAXUD Submitted for approval (SfA)
0.60 11.02.2021 DG TAXUD Document updated after ITSM3 TES and Member
State review
Business continuity plan ICS2
Date: 28/07/2023 3 / 31 Doc. Version: 1.20
0.50 09.12.2020 DG TAXUD Document updated based on the input from the
PG held 30.11.2020
0.42 05.11.2020 DG TAXUD Document updated based on the input from the
PG held 13.10.2020
0.30 13.10.2020 DG TAXUD Document updated with more detailed
information
0.20 11.09.2020 DG TAXUD Document updated based on the first PG
24.07.2020 input
0.10 24.07.2020 DG TAXUD Initial draft of the document
Business continuity plan ICS2
Date: 28/07/2023 4 / 31 Doc. Version: 1.20
TABLE OF CONTENTS
1 INTRODUCTION ................................................................................................................................... 5
1.1 Purpose ............................................................................................................................................. 5
1.2 Scope ................................................................................................................................................. 5
1.3 Target Audience ................................................................................................................................ 5
1.4 Structure of this document ............................................................................................................... 5
1.5 Reference and applicable documents ............................................................................................... 6
1.5.1 Reference Documents ................................................................................................................ 6
1.6 Abbreviations and Acronyms ............................................................................................................ 6
1.7 Definitions ......................................................................................................................................... 7
2 SOURCES OF SYSTEM UNAVAILABILITY ............................................................................................... 8
3 BUSINESS CONTINUITY MEASURES AND COMMUNICATION ............................................................... 9
3.1 Economic operator system unavailability ......................................................................................... 9
3.1.1 Unavailability identification and notification ............................................................................. 9
3.1.2 Activation of Business continuity plan ..................................................................................... 10
3.1.3 Business continuity measures .................................................................................................. 10
3.1.4 Recovery communication ......................................................................................................... 11
3.1.5 Recovery measures .................................................................................................................. 11
3.2 TI unavailability ............................................................................................................................... 13
3.2.1 UUM&DS Central component unavailability ............................................................................ 13
3.2.2 UUM&DS National component unavailability .......................................................................... 16
3.2.3 TAPAS unavailability ................................................................................................................. 19
3.2.4 STI (including STP) unavailability .............................................................................................. 22
3.3 ICS2 Common and/or ICS2 National component unavailability ...................................................... 25
3.3.1 Unavailability identification and notification ........................................................................... 25
3.3.2 Activation of Business continuity plan ..................................................................................... 26
3.3.3 Business continuity measures .................................................................................................. 26
3.3.4 Recovery communication ......................................................................................................... 27
3.3.5 Recovery measures .................................................................................................................. 27
3.4 MON&BS and EUCTP unavailability ................................................................................................ 28
3.4.1 MON&BS unavailability ............................................................................................................ 28
3.4.2 EUCTP unavailability ................................................................................................................. 28
3.5 ICS2 Message prioritisation ............................................................................................................. 29
3.5.1 External domain messages ....................................................................................................... 29
3.6 Information to be provided upon unavailability reporting and (de)activation of BCP ................... 30
3.6.1 EO – unavailability reporting: ................................................................................................... 30
3.6.2 EO – recovery reporting: .......................................................................................................... 30
3.6.3 CSD and NSD – unavailability reporting: .................................................................................. 30
3.6.4 CSD and NSD – recovery reporting: .......................................................................................... 30
3.6.5 Content of notifications to be sent to EO and IT service provider: .......................................... 30
3.6.6 Content of e-mail notifications to be sent to NSD: .................................................................. 30
3.7 Scheduled unavailability ................................................................................................................. 31
3.8 Transition from ICS2 Release 1 to ICS2 Release 2 ........................................................................... 31
Business continuity plan ICS2
Date: 28/07/2023 5 / 31 Doc. Version: 1.20
1 INTRODUCTION
1.1 Purpose
This document describes the impact on a business process and assesses the criticality of an unavailability of a
given component of the ICS2 (Economic operators systems, ICS2 Central components or Member state NES
components). Furthermore, it introduces measures to maintain an appropriate level of business continuity with
regard to the required customs formalities on the entry of goods.
1.2 Scope
This document covers the measures for continuity of the business of ICS2 Release 1 and Release 2 only. DG
TAXUD Business conti nuity plan, DG TAXUD IT Business continuity management systems (IT BCMS), any
Member State , Economic operator and/or IT service provider Business continuity plan, Member State IT
Business continuity plans, Disaster recovery plans and /or IT protocols for te chnical issues are not covered by
this document. These artefacts will be elaborated separately.
1.3 Target Audience
The intended audience for this document are:
Economic operators having legal obligation to use ICS2;
IT service providers providing services to those economic operators;
DG TAXUD;
DG TAXUD Central service desk;
National service desks of the Member States;
ICS2 users in Member States;
DG TAXUD development contractor.
1.4 Structure of this document
The document contains the following chapters:
Chapter 1 – Introduction: describes the scope and the objectives of the document;
Chapter 2 – Sources of system unavailability : provides the system components of ICS2 and a br ief
description of the impact on the business process.
Chapter 3 – Business continuity measures and communication : provides business continuity
measures, communication of unavailability, and activation of the BCP and recovery of the system, as
well as recovery strategy from a business perspective.
Business continuity plan ICS2
Date: 28/07/2023 6 / 31 Doc. Version: 1.20
1.5 Reference and applicable documents
1.5.1 Reference Documents
Ref. Title Reference Version Date
R01
Regulation (EU) No 952/2013 of the European
Parliament and of the Council of 9 October 2013
laying down the Union Customs Code
09.10.2013
R02
Commission Delegated Regulation (EU)
2015/2446 of 28 July 2015 supplementing
Regulation (EU) No 952/2013 of the European
Parliament and of the Council as regards detailed
rules concerning certain provisions of the Union
Customs Code
28.07.2015
R03
Commission Implementing Regulation (EU)
2015/2447 of 24 November 2015 laying down
detailed rules for implementing certain provisions
of Regulation (EU) No 952/2013 of the European
Parliament and of the Council laying down the
Union Customs Code
24.11.2015
R04 SD3-ICS2-HTI-Interface Control Document 3.30 02.03.2022
Table 1: Reference documents
1.6 Abbreviations and Acronyms
Abbreviation/Acronym Definition
AEO Authorised Economic Operator
ANES Arrival component of Member state’s National entry system
asap As soon as possible
BCP Business continuity plan
DES Customs office of destination
CCN2ng Common Communications Network 2
CFU Customs office of unloading
CNES Controls component of Member state’s National entry system
COFE Customs office of the first entry
CR ICS2 Common Repository
CSD Central Service Desk
DNL Do Not Load
ECCG Electronic Customs Coordination Group
ENS Entry Summary Declaration
EO Economic Operator
EU European Union
EUCTP European Union Customs Trader Portal
HRCM High Risk Cargo and Mail
HTI Harmonised trader interface
ICS2 Import Control System 2
IMS Involved Member State
MON&BS ICS2 Monitoring & Business Statistics
MRN Master Reference Number
Business continuity plan ICS2
Date: 28/07/2023 7 / 31 Doc. Version: 1.20
MS Member State
NES National Entry System
NSD National Service Desk
PNES Presentation component of Member State’s National entry system
RfI Request for Information
RfS Request for Screening
RMS Responsible Member State
STI Shared Trader Interface
STP STI Shared Trader Portal
TCG Trade Contact Group
TI Trader Interface
UUM&DS Uniform User Management and Digital Signatures
Table 2: Abbreviations and acronyms
1.7 Definitions
Term Description
Amendment ENS filing (IE3Axx) lodged by EO to amend previously lodged ENS filing.
asap As soon as possible but no later than 30 min since the moment it is possible
to perform this action.
Central service desk (CSD) The DG TAXUD contractor responsible for the central operation in ICS2
(ITSM) with 1st level and 2nd level support.
EO system System developed by economic operator or IT service provider used to
exchange ICS2 messages.
ICS2 Central components ICS2 CR, STI (including STP), TAPAS, UUM&DS Central component, CCN2 ng,
EUCTP and MON&BS.
ICS2 Common components ICS2 Central components except those being part of Trader interface
(section 3.2).
ICS2 National components NES (RMS), NES (IMS), NES (ANES), NES (PNES), NES (CNES).
Invalidation Request (IE3Q04) sent by EO to invalidate previously lodged ENS filing.
IT service provider IT service provider is entity acting as a technical sender of the messages and
assuming only technical responsibility.
Member state All European Uni on Member states and other countries and territories
applying EU customs legislation.
MS via MON&BS Article 81 of COMMISSION IMPLEMENTING REGULATION (EU) 2021/414
state that MS should apply BCP in case of ICS2 component unavailability. By
approving this d ocument Member states agree that BCP is going to be
activated by MON&BS without human intervention and notified to EOs
(including IT service providers) via EUCTP in accordance with the
requirements of this procedure.
MS user Customs officer, risk analyst or any other person in particular Member state
using ICS2.
National service desk A service component of the National support Centre provided by every
national administration to provide support to both internal MS users and
external end-users (local Economic operators) in the daily use of the ICS2.
Table 3: Definitions
Business continuity plan ICS2
Date: 28/07/2023 8 / 31 Doc. Version: 1.20
2 SOURCES OF SYSTEM UNAVAILABILITY
Depending on the source of unavailability, business continuity procedures will have to vary to some extent due
to their effectivene ss provided in a given case. Looking at it from an end-to-end perspective , the following
causes of unavailability of an electronically supported business process were identified:
a relevant electronic system of the economic operator is unavailable;
a relevant electronic national customs application or supporting system is unavailable;
a relevant central component service is unavailable.
Service providers who provide services for economic operators (e.g. network connectivity, software for
electronic communication/connection with relevant customs systems etc.) are not considered being directly
responsible with regard to legal requirements stemming from the customs legislation. Nevertheless, they have
a responsibility to fulfil the contractual requirements of the established contract with an economic operator
and act in accordance with this procedure if economic operator has empowered IT service provider to report
unavailability and recovery of system on behalf of that economic operator .
In order to implement a sufficient business continuity plan that is underpinned by effective measures the
following factors are to be considered:
What system component is not available or has a malfunction seriously affecting the business
operations?
What is the impact of the unavailability of the given system component on the end-to-end process?
What are the available effective options for efficient and appropriate measures to overcome the
impact?
The following matrix shows the relevant ICS2 system components and their impact on the business process in
case of unavailability:
Table 4 System unavailability
The following subsections will further describe the business continuity measures to be applied in case of
unavailability of each ICS2 component and h ow the unavailability, BCP activation and recovery is
communicated between the Central and National service desks and the economic operators and their IT service
providers, if applicable.
Send ENS
Register
and send
MRN
Lifecycle
validation Referrals Assessment Complete DNL Arrival Presentation Controls
3 0 0 3 2 2 2 0 1
3 0 0 3 3 3 2 0 1
2 0 0 2 0 0 2 0 0
2 0 0 2 0 0 2 0 0
0 3 0 3 3 3 2 0 1
3 3 0 3 3 3 2 0 1
0 0 3 3 3 3 3 3 3
0 0 0 2 0 0 2 3 3
3 Total disfunction
2 Partial disfunction / degradation
1 Limited disfunction (non essential)
No impact
Category A1 - EOS impacted Category A1 - EOS impacted Category B - less time critical
Impact of Component Unavailability on capability
ICS2 National components
STI
STI
STP
ICS2 Common components
CAPABILITIES
IT Component
EO System
TI
TAPAS
UUM&DS
Central Component
National Component
Business continuity plan ICS2
Date: 28/07/2023 9 / 31 Doc. Version: 1.20
3 BUSINESS CONTINUITY MEASURES AND COMMUNICATION
An economic operator is directly responsible to comply with legal requirements of the customs legislation. IT
service provider, CSD and DG TAXUD will support the business continuity process but customs office is always
the one taking decisions and providing in structions for EOs having legal obligation to lodge ENS in its country
in case of unavailability of ICS2 components.
Unavailability (scheduled or unscheduled) is recorded by EO and/or its IT service provider in EUCTP. Upon
registration of unavailability notification confirming successful notification of unavailability will be displayed in
EUCTP notification list.
3.1 Economic operator system unavailability
The unavailability of an economic operator’s system affects either one economic operator or several economic
operators, which e.g. are customers of an IT service provider.
The business continuity measures will depend on which part of the end -to-end process is affected – whether
the ENS filing is already lodged or not, whether consignments have arrived or not etc.
Table 5 EO System unavailability
Figure 1 Business continuity plan activation timeline for EO system
The EO system is considered to be unavailable when it cannot interact (send and/or rece ive messages) as per
the specifications of ICS2 regardless of the reason. If the EO system unavailability can be compensated
(alternatively handled) by another facility of the Economic Operator , IT service provider or by functionality
provided by ICS2 Central components (e.g. STP 1) without impact on the operations continuity, EO can use this
functionality despite BCP for EO system is activated.
3.1.1 Unavailability identification and notification
Actor Actions to be taken by actors Timeframe for actions
Relevant EO
EO using IT service provider services can empower IT service provider to notify
EO system unavailability in EUCTP. Legal obligation to lodge ENS, respond to
referral requests etc. remain on EO itself and empowerment of IT service
provider does not absolve EO from responsibility in case IT service provider
has not notified unavailability of EO system.
When
necessary
1 STP can be used to get DNL and referral request notifications in case of EO system and TAPAS unavailability. EO should
manually activate this option in STI-STP Manage preferences tab.
Send ENS
Register
and send
MRN
Lifecycle
validation Referrals Assessment Complete DNL Arrival Presentation Controls
3 0 0 3 2 2 2 0 1
CAPABILITIES
IT Component
EO System
Business continuity plan ICS2
Date: 28/07/2023 10 / 31 Doc. Version: 1.20
Once the EO has detected an unavailability in its system or system
components having impact on operations continuity, the unavailability has to
be notified by using EUCTP. This can be done by EO or IT service provider (if
EO is using IT service provider services) . Nevertheless, EO should ensure that
information on unavailability is not duplicated in EUCTP. EO can indicate one
or several MS which should be notified about system unavailability. In
response it gets notification via EUCTP on successful reception of information.
The unavailability notification has to be sent within 30 minutes from moment
when unavailability was detected and it has to contain all the details as
elaborated in [3.6.1].
< 30 min
IT Service
provider
Only in cases when EO has empowered its IT Service provider to notify
unavailability, IT service provider in case of its system unavailability can notify
it on behalf of EO by using EUCTP [3.6.1] in accordance with agreements
reached between EO and IT service provider.
IT service provider can indicate one or several MS which should be n otified
about system unavailability in case only one EO is impacted. If IT service
provider will notify unavailability of several EOs at the same time all MS will
receive e-mail notification.
< 30 min
Impacted
NSD
The NSD of MS that are to be notified w ill immediately receive e -mail
notification on EO system unavailability [3.6.6].
Information on EO system unavailability should be disseminated to MS users.
asap
3.1.2 Activation of Business continuity plan
Actor Actions to be taken by actors Timeframe for actions
MS via MON&BS If the EO system is not restored within 30 min utes since
unavailability was reported (corresponding recovery notification is
not sent via EUCTP) by EO or empowered IT service provider the
business continuity plan is automatically activated by MON&BS for
those MSs that were indicated as impacted in section 3.1.1.
Date/time of
unavailability
notification + 30
min
Impacted NSD Get e-mail notification on activation of BCP [3.6.6] and disseminate
it to MS users.
asap
Impacted EO and IT
service provider
Get notification via EUCTP on activation of BCP [3.6.5]. asap
3.1.3 Business continuity measures
Step in a business
process BCP measure for EO
BCP measure – Lodgement of new ENS
ENS filings No new ENS filings will be lodged during the unavailability of the component by
using EO system.
New ENS filings can be lodged during the unavailability of the component via STP.
EO is free to choose whether to use STP functionality or not to lodge new ENSs.
Amendment No amendments will be done on the already lodged ENSs via EO system.
ENS lodged via STP can still be amended via STP.
Invalidation Invalidation of ENS will not be performed by using EO system.
ENS lodged via STP can still be invalidated via STP.
Business continuity plan ICS2
Date: 28/07/2023 11 / 31 Doc. Version: 1.20
BCP measure – Risk assessment of already lodged ENSs
Referral requests (RFI,
RFS) to the EO
Receive via STP or via alternative communication channels – e-mail, phone, etc. in
case of STP unavailability.
Referral responses from
the EO Communicate via alternative communication channels – e-mail, phone, etc.
DNL Receive via STP and via phone and e-mail.
Assessment complete
notification Cannot receive during component unavailability.
Advance control
notification to AEO Receive via alternative communication channels – e-mail, phone, etc.
BCP measure – Arrival notification
Arrival notification
Lodge via STP or NES (ANES) of COFE (if that particular COFE provide a national
arrival system).
No new arrival notificati on will be lodged via EO system during EO system
unavailability.
Control notification Is received via NES (ANES) and/or via alternative communication channels – NES (ANES), NES (PNES), e-mail, phone, etc.
BCP measure – Presentation and controls
Presentation
information
No impact if ENS has been lodged and EO has received ENS registration response
– presentation is not in the scope of ICS2 and should be done via NES (PNES). If
ENS is not lodged at the moment of presentation of the consignments to customs
EO should follow instructions provided by customs.
Controls and control
results No impact.
3.1.4 Recovery communication
Actor Actions to be taken by actor Timeframe for actions
Impacted EO or IT
Service provider
Once the EO system has been restored this has to be notified by the
actor who notified this unavailability by using EUCTP [3.6.2]. After
automatic deactivation of BCP in response in response both EO and
where applicable IT service provider will receive notification via
EUCTP on deactivation of BCP [3.6.5].
asap
Impacted NSD Get e-mail notification on EO system recovery and deactivation of BCP [3.6.6]. NSD disseminate it to MS users. asap
3.1.5 Recovery measures
Component Actions to be taken by actors
EO system
EO has to lodge ENS filings for all the consignments that have not yet been lodged
during EO system unavailability.
EO can amend and invalidate the ENS filings via EO system which are not yet in the state
‘Presented’ or later state.
EO has to provide referral responses that have been provided via alternative
communication channels retroactively.
EO can waive lodgement of arrival notification in case of carrier intend s to unload all
the consignments of particular ENS from the means of transport and present it to the
COFE. If this is not the case and some consignments remain on board of the means of
Business continuity plan ICS2
Date: 28/07/2023 12 / 31 Doc. Version: 1.20
transport to be dispatched to MS of destination or MS of unloading arrival notification
should be lodged. If EO has presented consignments to customs before component has
been recovered it is possible that EO will receive IE3N07 message after recovery of the
component as consignments are already in state ‘Presented’ or later state.
The messages need to be sent in quantities (not more than 400 messages per second)
in order not to disrupt the regular performance of the TI due to abnormally high levels.
The messages must be distributed in accordance with the assigned priority in the
section 3.5.
ICS2 Central
components
The TI needs to re -send the messages to the EO for which the delivery was not
confirmed by the technical protocol.
ICS2 National
components Risk analysis/e-screening is performed on the provided ENSs even if with a delay.
Business continuity plan ICS2
Date: 28/07/2023 13 / 31 Doc. Version: 1.20
3.2 TI unavailability
3.2.1 UUM&DS Central component unavailability
Table 6 UUM&DS unavailability
Figure 2 Business continuity plan activation timeline for UUM&DS component
The unavailability of the UUM&DS services prevents the system from identifying and authenticating the sender
of a message. The messages submitted via EO system are rejected with an error message [R04] and it is not
possible to authenticate STI and STP users. Consequently, the business process does not continue and messages
are not registered, further processed and responded. Nevertheless, in case of UUM&DS unavailability EO can
still receive messages via EO system addressed to him.
The UUM&DS component is considered unavailable in the case of the failover domain activation failure.
Nevertheless, the UUM&DS central component information is cached in TAPAS for 24 hours. In case of
UUM&DS Central component unavailability an Economic Operator can send a message by using EO system
within 24 hours from the moment the last message was accepted by STI. Therefore, those EOs using EO system
can continue to exchange messages even if BCP has been activated.
3.2.1.1 Unavailability identification and notification
Actor Actions to be taken by actors Timeframe for actions
CSD The CSD records unavailability in MON&BS [3.6.3].
The unavailability has to be recorded in MON&BS within 30 minutes from
the moment unavailability was detected.
< 30 min
All NSDs The NSD of each MS gets e-mail notification on reported unavailability [3.6.6]
and notifies unavailability to MS users.
asap
EO and IT
service
provider
All EOs (including IT service provider) having access to EUCTP get notification
in it that particular ICS2 component is unavailable [3.6.5].
asap
3.2.1.2 Activation of Business continuity plan
Actor Actions to be taken by actors Timeframe for actions
MS via
MON&BS
If the UUM&DS Central component is not restored within 30 min utes since
unavailability was reported by CSD (corresponding recovery notification is
not recorded in MON&BS) the business continuity plan is automatically
activated by MON&BS.
Date/time of
unavailability
notification +
30 min
Send ENS
Register
and send
MRN
Lifecycle
validation Referrals Assessment Complete DNL Arrival Presentation Controls
2 0 0 2 0 0 2 0 0
2 0 0 2 0 0 2 0 0
CAPABILITIES
IT Component
TI UUM&DS
Central Component
National Component
Business continuity plan ICS2
Date: 28/07/2023 14 / 31 Doc. Version: 1.20
All NSDs Get e-mail notification on activation of BCP [3.6.6] and disseminate it to MS
users.
asap
EO and IT
service
provider
All EOs (including IT service provider s) having access to EUCTP get
notification within EUCTP on activation of BCP [3.6.5].
asap
3.2.1.3 Business continuity measures
Step in a business
process BCP measure for EO
BCP measure – Lodgement of new ENS
ENS filings Authentication information is cached in TAPAS for 24 hours since the last
message was sent from EO system to STI. Therefore, some EO system users
could still be able to lodge ENSs for certain period of time.
EO that is STP user and EO that has n ot sent any message via its EO system
within the last 24 hours will not be able to lodge new ENS during the
unavailability of the component via EO system and STP.
Amendment Some EO system users could be able to lodge amendments for certain period
of time.
EO that is STP user and EO that has not sent any message via its EO system
within the last 24 hours will not be able to lodge new amendments during
the unavailability of the component via EO system and STP.
Invalidation Some EO system users could be able to lodge invalidation requests for
certain period of time.
EO that is STP user and EO that has not sent any message via its EO system
within the last 24 hours will not be able to lodge invalidation request during
the unavailability of the component via EO system and STP.
BCP measure – Risk assessment of already lodged ENSs
Referral requests (RFI, RFS)
to the EO
Receive via EO system and alternative communication channels – e-mail,
phone, etc.
EO that is STP user will receive referral request via alternative
communication channels – e-mail, phone, etc. and in STP after recovery of
UUM&DS.
Referral responses from the
EO
Send via EO system where still possible or communicate via alternative
communication channels – e-mail, phone, etc.
DNL Receive via EO system and via phone and e-mail.
Assessment complete
notification
Receive via EO system or receive it with delay in STP.
Advance control notification
to AEO
Receive via EO system or alternative communication channels – NES (PNES),
e-mail, phone, etc.
BCP measure – Arrival notification
Arrival notification Submit via EO system or NES (ANES) of COFE (if that particular COFE provide
a national arrival system).
EO that is STP user or EO that has not sent via EO system any message within
the last 24 hours will not be able to lodged new arrival notification during
the unavailability of the component via EO system and STP.
Control notification Receive via EO system or alternative communication channels – NES (ANES),
NES (PNES), e-mail, phone, etc.
Business continuity plan ICS2
Date: 28/07/2023 15 / 31 Doc. Version: 1.20
BCP measure – Presentation and controls
Presentation information No impact if ENS has been lodged and EO has received ENS registration
response – presentation is not in the scope of ICS2 and should be done via
NES (PNES). If ENS is not lodged at the moment of presentation of the
consignments to customs EO should follow instructio ns provided by
customs.
Controls and control results No impact.
3.2.1.4 Recovery communication
Actor Actions to be taken by actor Timeframe for actions
CSD When component has been recovered the CSD updates unavailability
record in MON&BS by indicating unavailability end date/time [3.6.4]. BCP
is automatically deactivated.
asap
All NSDs Get e -mail notification on UUM&DS Central component recovery and
deactivation of BCP [3.6.6]. NSD disseminate it to MS users.
asap
EO and IT
service
provider
All EOs (including IT service provider s) having access to EUCTP get
notification within EUCTP on deactivation of BCP [3.6.5]. asap
3.2.1.5 Recovery measures
Component Actions to be taken by actors
EO system,
STP
EO has to lodge ENS filings for all the consignments that have not yet been lodged during
UUM&DS central component unavailability.
EO can amend and invalidate the ENS filings which are not yet in the state ‘Presented’ or
later state.
EO has to provide referral responses that have been provided via alternative
communication channels.
EO can waive lodgement of arrival notification in case of carrier intend to unload all the
consignment of particular ENS from the means of transport and present it in the COFE. If
this is not the case and some consignments remain on board of means of transport to be
dispatched to MS of destination or MS of unloading arrival notification should be lodged.
If you have presented consignments to customs before component has been recovered it
is possible that you will receive IE3N07 message after recovery o f the component as
consignments are already in state ‘Presented’ or later state.
The messages need to be sent in quantities (not more than 400 messages per second) not
to disrupt the regular performance of the TI due to abnormally high levels. The messag es
must be distributed in accordance with the assigned priority.
ICS2 National
component
Risk analysis/e-screening is performed to the provided ENSs even if with a delay.
Business continuity plan ICS2
Date: 28/07/2023 16 / 31 Doc. Version: 1.20
3.2.2 UUM&DS National component unavailability
Table 7 UUM&DS unavailability
Figure 3 Business continuity plan activation timeline for UUM&DS component
The unavailability of UUM&DS National component will prevent the system from identifying and authenticating
the sender of a message. The messages submitted via EO system are rejected with an error message and it is
not possible to authenticate STI and STP users. Consequently, the business process does not continue and
messages are not registered, further processed and responded. Nevertheless, in case of UUM&DS unavailability
EO can still receive messages via EO system addressed to him.
The UUM&DS national c omponent is considered unavailable in the case of the failover domain activation
failure.
3.2.2.1 Unavailability identification and notification
Actor Actions to be taken by actors Timeframe for actions
NSD
The impacted NSD of the affected MS records unavailability in MON&BS
[3.6.3].
The unavailability notification has to be recorded in MON&BS within 30
minutes from the moment unavailability was detected.
< 30 min
All NSDs NSD of each MS gets e-mail notification on reported unavailability [3.6.6]
and notifies unavailability to MS users.
asap
EO and IT
service
provider
All EOs (including IT service provider) having access to EUCTP get
notification in it that particular ICS2 component is unavailable [3.6.5].
asap
3.2.2.2 Activation of Business continuity plan
Actor Actions to be taken by actors Timeframe for actions
MS via
MON&BS
If the UUM&DS National component is not restored within 30 min utes
since unavailability was reported by N SD (corresponding recovery
notification is not recorded in MON&BS) the business continuity plan is
automatically activated by MON&BS.
Date/time of
unavailability
notification + 30
min
All NSDs Get e-mail notification on activation of BCP [3.6.6] and disseminate it to
MS users.
asap
Send ENS
Register
and send
MRN
Lifecycle
validation Referrals Assessment Complete DNL Arrival Presentation Controls
2 0 0 2 0 0 2 0 0
2 0 0 2 0 0 2 0 0
CAPABILITIES
IT Component
TI UUM&DS
Central Component
National Component
Business continuity plan ICS2
Date: 28/07/2023 17 / 31 Doc. Version: 1.20
EO and IT
service
provider
All EOs (including IT service provider) having access to EUCTP get
notification in EUCTP on activation of BCP [3.6.5].
asap
3.2.2.3 Business continuity measures
Step in a business
process BCP measure for EO
BCP measure – Lodgement of new ENS
ENS filings No new ENS filings can be lodged.
Amendment No new ENS amendments can be lodged.
Invalidation Invalidation of ENS will not be performed.
Risk assessment of already lodged ENSs
Referral requests (RFI,
RFS) to the EO
Receive via EO system and alternative communication channels – e-mail,
phone, etc.
EO that is STP user will receive referral request via alternative communication
channels – e-mail, phone, etc. and in STP after recovery of UUM&DS.
Referral responses from
the EO
Communicate via alternative communication channels – e-mail, phone, etc.
DNL Receive via EO system and/or via phone and e-mail.
Assessment complete
notification
Receive via EO system or receive it with delay in STP.
Advance control
notification to AEO
Receive via EO system or alternative communication channels – NES (PNES),
e-mail, phone, etc.
BCP measure – Arrival notification
Arrival notification Submit via EO system or NES (ANES) of COFE (if that particular COFE provide a
national arrival system).
EO will not be able to lodge new arrival notification during the unavailability
of the component via EO system and STP.
Control notification Receive via EO system or alternative communication channels – NES (ANES),
NES (PNES), e-mail, phone, etc.
BCP measure – Presentation and controls
Presentation information No impact if ENS has been lodged and EO has received ENS registration
response – presentation is not in the scope of ICS2 and should be done via NES
(PNES). If ENS is not lodged at the moment of presentation of the
consignments to customs EO should follow instructions provided by customs.
Controls and control
results
No impact.
3.2.2.4 Recovery communication
Actor Actions to be taken by actor Timeframe for actions
NSD
The impacted NSD updates unavailability record in MON&BS by
indicating unavailability end date/time [3.6.4].
asap
All NSDs Get e-mail notification on UUM&DS National component recovery and deactivation of BCP [3.6.6]. NSD disseminate it to MS users. asap
Business continuity plan ICS2
Date: 28/07/2023 18 / 31 Doc. Version: 1.20
EO and IT service
provider
All EOs (including IT service provider) having access to EUCTP get
notification in EUCTP on deactivation of BCP [3.6.5]. asap
3.2.2.5 Recovery measures
Component Actions to be taken by actors
EO system, STP
EO has to lodge ENS filings for all the consignments that have not yet been lodged
during UUM&DS national component unavailability.
EO can amend and invalidate the ENS filings which are not yet in the state ‘Presented’
or later state.
EO has to provide referral responses that have been provided via alternative
communication channels.
EO can waive lodgement of arrival notification in case of carrier intend to unload the
consignment of particular ENS from the means of transport and present it in the
COFE. If this is not the case and some consignments remain on board of means of
transport to be dispatched to MS of destination or MS of unloading arrival notification
should be lodged. If EO has presented consignments to customs before component
has been recovered it is possible that EO will receive IE3N07 message after recovery
of the component as consignments are already in state ‘Presented’ or later state.
The messages need to be sent in quantities (not more than 400 messages per second)
not to disrupt the regular performance of the TI due to abnormally high levels. The
resulting traffic should not exceed limits agreed on technical protocol. The messages
must be distributed in accordance with the assigned priority.
ICS2 National
components
Risk analysis/e-screening is performed to the provided ENSs even if with a delay.
Business continuity plan ICS2
Date: 28/07/2023 19 / 31 Doc. Version: 1.20
3.2.3 TAPAS unavailability
Table 8 TAPAS unavailability
Figure 4 Business continuity plan activation timeline for TAPAS component
TAPAS is considered to be unavailable when it cannot interact as per the specifications regardless of the reason.
TAPAS unavailability can be compensated (alternatively handled) by STP without impact on the operations
continuity. For EO there is no reason to apply BCP measures if STP functionality can be used to ensure
operations continuity.
3.2.3.1 Unavailability identification and notification
Actor Actions to be taken by actors Timeframe for actions
CSD The CSD records unavailability in MON&BS [3.6.3].
The unavailability notification has to be recorded within 30 minutes from
the moment when unavailability was detected.
< 30 min
All NSDs The NSD of each MS gets e -mail notification on reported unavailability
[3.6.6] and notifies unavailability to MS users.
asap
EO and IT
service
provider
All EOs (including IT service provider) having access to EUCTP get
notification in it that particular ICS2 component is unavailable [3.6.5].
asap
3.2.3.2 Activation of Business continuity plan
Actor Actions to be taken by actors Timeframe for actions
MS via
MON&BS
If the TAPAS is not restored within 30 minutes since unavailability was
reported by CSD (corresponding recovery notification is not recorded in
MON&BS) the business continuity plan is automatically activated by
MON&BS.
Date/time of
unavailability
notification + 30
min
All NSDs Get e-mail notification on activation of BCP [3.6.6] and disseminate it to MS
users.
asap
EO and IT
service
provider
All EOs (including IT se rvice provider) having access to EUCTP get
notification in EUCTP on activation of BCP [3.6.5].
asap
Send ENS
Register
and send
MRN
Lifecycle
validation Referrals Assessment Complete DNL Arrival Presentation Controls
3 0 0 3 3 3 2 0 1
CAPABILITIES
IT Component
TI TAPAS
Business continuity plan ICS2
Date: 28/07/2023 20 / 31 Doc. Version: 1.20
3.2.3.3 Business continuity measures
Step in a business
process BCP measure for EO
BCP measure – Lodgement of new ENS
ENS filings No new ENS filings will be lodged during the unavailability of the component
by using EO system.
New ENS filings can be lodged during the unavailability of the component via
STP. EO is free to choose whether to use STP functionality or not to lodge
new ENSs.
Amendment No amendments will be done on the already lodged ENSs via EO system.
Only ENS lodged via STP can be amended via STP.
Invalidation Invalidation of ENS will not be performed via EO system.
Only ENS lodged via STP can be invalidated via STP.
BCP measure – Risk assessment of already lodged ENSs
Referral requests (RFI, RFS) to
the EO
Receive via STP.
Referral responses from the
EO
Communicate via alternative communication channels – e-mail, phone, etc.
DNL Receive via STP and via phone and e-mail.
Assessment complete
notification
Receive via STP for ENSs lodged via STP.
Cannot receive during component unavailability for ENSs lodged via EO
system.
Advance control notification
to AEO
Receive via STP for ENSs lodged via STP.
Receive via alternative communication channels – e-mail, phone, etc.
BCP measure – Arrival notification
Arrival notification Lodge via STP or NES (ANES) of COFE (if that particular COFE provide a
national arrival system).
If it is not possible to l odge via STP or NES (ANES) of COFE , lodge via EO
system. Arrival notification will be queued and processed after recovery of
the compon ent. If you have presented consignments to customs before
component has been recovered it is possible that you will receive IE3N07
message after recovery of the component as consignments are already in
state ‘Presented’ or later state.
Control notification Received via STP , NES (ANES) or via alternative communication channels –
NES (PNES), e-mail, phone, etc.
BCP measure – Presentation and controls
Presentation information No impact if ENS has been lodged and EO has received ENS registration
response – presentation is not in the scope of ICS2 and should be done via
NES (PNES). If ENS is not lodged at the moment of presentation of the
consignments to customs EO should follow instructions provided by
customs.
Controls and control results No impact.
Business continuity plan ICS2
Date: 28/07/2023 21 / 31 Doc. Version: 1.20
3.2.3.4 Recovery communication
Actor Actions to be taken by actor Timeframe for actions
CSD When component has been recovered the CSD updates unavailability
record in MON&BS by indicating unavailability end date and time
[3.6.4]. BCP is automatically deactivated.
asap
All NSDs Get e -mail notification on TAPAS recovery and deactivation of BCP
[3.6.6]. NSD disseminate it to MS users.
asap
EO and IT
service provider
All EOs (including IT service provider) having access to EUCTP get
notification in EUCTP on deactivation of BCP [3.6.5]. asap
3.2.3.5 Recovery measures
Component Actions to be taken by actors
EO system
EO has to lodge ENS filings for all the consignments that have not yet been lodged during
EO system unavailability.
EO can amend and invalidate the ENS filings via EO system which are not yet in the state
‘Presented’ or later state.
EO has to provide referral responses that have been provided via alternative
communication channels.
EO can waive lodgement of arrival notification in case if carrier intend to unload the
consignment of particular ENS from the means of transport and present it in the COFE. If
this is not the case and some consignments remain on board of means of transport to be
dispatched to MS of destination or MS of unloading arrival notification should be lodged.
If you have presented consignments to customs before component has been recovered it
is possible that you will receive IE3N07 message after recover y of the component as
consignments are already in state ‘Presented’ or later state.
The messages need to be sent in quantities (not more than 400 messages per second) not
to disrupt the regular performance of the TI due to abnormally high levels. The messages
must be distributed in accordance with the assigned priority in the section 3.5.
ICS2 Central
components
The TI needs to re-send the messages to the EO for which the delivery was not confirmed
by the technical protocol.
ICS2 National
components
Risk analysis/e-screening is performed to the provided ENSs even if with a delay.
Business continuity plan ICS2
Date: 28/07/2023 22 / 31 Doc. Version: 1.20
3.2.4 STI (including STP) unavailability
Table 9 STI unavailability
Figure 5 Business continuity plan activation timeline for STI component
No message exchange between the Economic Operators and the STI (STP) can take place. Economic Operators
are not able to use STP functionality to exchange any ICS2 messages.
In case of unavailability of the STI (STP) , no mes sages from the Economic Operators will be functionally
validated, registered and further processed. Moreover, no messages are sent to the Economic Operators for
the ENSs which are already in process. The messages received from the EO system are stored and queued in
TAPAS and can be processed when STI is available again. There is no need for the Economic Operators to re -
send those messages. The outgoing STI message s are queued but not sent. The operations performed by the
STI are completely blocked – no MRNs are generated and communicated.
STP is available to economic operators as of ICS2 Release 2.
3.2.4.1 Unavailability identification and notification
Actor Actions to be taken by actors Timeframe for actions
CSD The CSD records unavailability in MON&BS [3.6.3].
The unavailability notification has to be recorded within 30 minutes from
the moment unavailability was detected.
< 30 min
All NSDs The NSD of each MS gets e -mail notification on reported unavailability
[3.6.6] and notifies unavailability to MS users.
asap
EO and IT
service
provider
All EOs (including IT service provider) having access to EUCTP get
notification in it that particular ICS2 component is unavailable [3.6.5].
asap
3.2.4.2 Activation of Business continuity plan
Actor Actions to be taken by actors Timeframe for actions
MS via
MON&BS
If the STI (STP) is not restored within 30 minutes since unavailability was
reported by CSD (corresponding recovery notification is not recorded in
MON&BS) the business continuity plan is automatically activated by
MON&BS.
Date/time of
unavailability
notification + 30
min
Send ENS
Register
and send
MRN
Lifecycle
validation Referrals Assessment Complete DNL Arrival Presentation Controls
0 3 0 3 3 3 2 0 1
3 3 0 3 3 3 2 0 1
STI
STI
STP
CAPABILITIES
IT Component
TI
Business continuity plan ICS2
Date: 28/07/2023 23 / 31 Doc. Version: 1.20
All NSDs Get e-mail notification on activation of BCP [3.6.6] and disseminate it to
MS users.
asap
EO and IT
service
provider
All EOs (including IT service provider s) having access to EUCTP get
notification within EUCTP on activation of BCP [3.6.5].
asap
3.2.4.3 Business continuity measures
Step in a business
process BCP measure for EO
BCP measure – Lodgement of new ENS
ENS filings New ENS filings can be lodged via EO system. MRN for that ENS filing will be
generated upon recovery of the component.
If the message load is too large the NSD may request EO to delay sending of the
messages.
No new ENS filings can be lodged via STP.
Amendment Amendments of the ENSs can be lodged via EO system, but already lodged ENSs
will not be amended until the system is restored.
No new ENS amendments can be lodged via STP.
Invalidation Invalidation of ENS can be requested via EO system but will not be performed until
the system is restored.
Invalidation of ENS will not be performed via STP.
BCP measure – Risk assessment of already lodged ENSs
Referral requests (RFI,
RFS) to the EO
Receive via alternative communication channels – e-mail, phone, etc.
Referral responses from
the EO
Responses to the referral requests received before unavailability of STI should be
sent via EO system and/or via alternative communication channels – e-mail,
phone, etc.
Responses to the referral requests received during unavailability of STI should be
sent via alternative communication channels – e-mail, phone, etc.
DNL Receive via phone and e-mail.
Assessment complete
notification
Is not sent to the EO system during the unavailability of STI. Receive with the
delay.
Advance control
notification to AEO
Receive via alternative communication channels – e-mail, phone, etc.
BCP measure – Arrival notification
Arrival notification Lodge via NES (ANES) of COFE (if that particular COFE provide a national arrival
system).
If it is not possible to l odge via NES (ANES) of COFE , lodge via EO system. Arrival
notification will be queued and processed after recovery of the component. If you
have presented consignments to customs before component has been recovered
it is possible that you will receive IE3N07 message after recovery of the
component as consignments are already in state ‘Presented’ or later state.
If it is not possible to lodge via NES (ANES) of COFE and via EO system, lodgement
of arrival notification can be waived in case of carrier intend to unload all the
consignment of particular ENS from the means of transport and present it in the
COFE. If this is not the case and some consignments remain on board of means of
Business continuity plan ICS2
Date: 28/07/2023 24 / 31 Doc. Version: 1.20
transport to be dispatched to MS of destination or MS of unloading arrival
notification should be lodged with the delay.
Control notification Receive via NES (ANES) or alternative communication channels – NES (PNES), e -
mail, phone, etc.
BCP measure – Presentation and controls
Presentation
information
No impact if ENS has been lodged and EO has received ENS registration response
– presentation is not in the scope of ICS2 and should be done via NES (PNES). If
ENS is not lodged at the moment of presentation of the consignments to customs
EO should follow instructions provided by customs.
Controls and control
results
No impact.
3.2.4.4 Recovery communication
Actor Actions to be taken by actor Timeframe for actions
CSD When component has been recovered the CSD updates unavailability record
in MON&BS by indicating unavailability end date/ time [3.6.4]. BCP is
automatically deactivated.
asap
All NSDs Get e-mail notification on STI recovery and deactivation of BCP [3.6.6]. NSD
disseminate it to MS users.
asap
EO and IT
service
provider
All EOs (including IT service provider s) having access to EUCTP get
notification within EUCTP on deactivation of BCP [3.6.5]. asap
3.2.4.5 Recovery measures
Component Actions to be taken by actors
EO system, STP
EO has to lodge ENS filings for all the consignments that have not yet been lodged via
EO system or STP during STI (STP) unavailability. EO does not need to resend ENS filings
that has been sent to STI via EO system – these messages are queued and will be
processed after STI (STP) recovery.
EO can amend and invalidate the ENS filings that are not in state "Presented" or later
state. If amendment or invalidation was already requested via EO system during the
unavailability of STI (STP), no further actions from the EO are needed.
EO has to provide referral responses via EO system or STP that have been provided via
alternative communication channels only. If referral responses were submitted via the
EO system and alternative communication channels during the STI (STP) unavailability,
no further actions from the EO are needed.
EO can waive lodgement of arrival notification in case of carrier intend to unload the
consignment of particular ENS from the means of transport and present it in the COFE.
If this is not the case and some consignments remain on board of means of transport
to be dispatched to MS of destination or MS of unloading arrival notification should be
lodged. If EO has presented consignments to customs before component has been
recovered it is possible that EO will receive IE3N07 message after recovery of the
component as consignments are already in state ‘Presented’ or later state.
The messages need to be sent in quantities (not more than 400 messages per second)
in order not to disrupt the regular performance of the TI due to abnormal high levels.
The resulting traffic should not exceed limits agreed on technical protocol. The
messages must be distributed in accordance with the assigned priority (please see
section 3.5).
ICS2 Central
components
The TI needs to re -send the messages to the EO for which the delivery was not
confirmed by the technical protocol.
Business continuity plan ICS2
Date: 28/07/2023 25 / 31 Doc. Version: 1.20
ICS2 National
components
Risk analysis/e-screening is performed to the provided ENSs even if with a delay.
3.3 ICS2 Common and/or ICS2 National component unavailability
Table 10 ICS2 Common and/or ICS2 National component unavailability
Figure 6 Business continuity plan activation timeline for ICS2 Common and/or ICS2 National component
All received messages will be queued during unavailability of component and processed after recovery.
The ENS filings will be validated by STI, registered, but it could have impact to ENS life cycle validation in some
cases EO won’t be informed on MRN and no risk analysis will be triggered/performed. The arrival notifications
submitted via EO system or STP will be validated by STI, registered, but it could have impact to consignment
state correctness checks and generation of MRN.
Communication between customs and EO on the ongoing risk analysis process, referrals and results of it via
the system is not possible.
3.3.1 Unavailability identification and notification
Actor Actions to be taken by actors Timeframe for actions
CSD The CSD records ICS2 Common component unavailability in MON&BS [3.6.3].
The unavailability notification has to be recorded within 30 minutes after
unavailability was detected.
< 30 min
NSD The impacted NSD records ICS2 National component unavailability in
MON&BS [3.6.3].
The unavailability notifica tion has to be recorded within 3 0 minutes after
unavailability was detected.
< 30 min
All NSDs The NSD of each MS gets e-mail notification on reported unavailability [3.6.6]
and notifies unavailability to MS users.
asap
EO and IT
service
provider
All EOs (including IT service provider) having access to EUCTP get notification
on ICS2 Common component and/or ICS2 National component unavailability
[3.6.5]. It is not disc losed to EOs which of above -mentioned components is
unavailable.
asap
Send ENS
Register
and send
MRN
Lifecycle
validation Referrals Assessment Complete DNL Arrival Presentation Controls
0 0 3 3 3 3 3 3 3
0 0 0 2 0 0 2 3 3ICS2 National components
ICS2 Common components
CAPABILITIES
IT Component
Business continuity plan ICS2
Date: 28/07/2023 26 / 31 Doc. Version: 1.20
3.3.2 Activation of Business continuity plan
Actor Actions to be taken by actors Timeframe for actions
MS via
MON&BS
If the ICS2 Common component and/or ICS2 National component is not
restored within 30 minutes since unavailability was reported by CSD or
NSD (corresponding recovery notification is not recorded in MON&BS)
the business continuity plan is automatically activated by MON&BS.
Date/time of
unavailability
notification + 30
min
All NSDs Get e-mail notification on activation of BCP [3.6.6] and disseminate it to
MS users.
asap
EO and IT
service provider
All EOs (including IT service provider) having access to EUCTP get
notification within EUCTP on activation of BCP [3.6.5].
asap
3.3.3 Business continuity measures
Step in a business
process BCP measure for EO
BCP measure – Lodgement of new ENS
ENS filings No impact – lodge ENS filing via EO system and/or STP.
Amendment No impact – amend via EO system and/or STP.
Invalidation No impact – invalidate via EO system and/or STP.
BCP measure – Risk assessment of already lodged ENSs
Referral requests (RFI,
RFS) to the EO
Receive via alternative communication channels – e-mail, phone, etc.
Referral responses from
the EO
Referral response to already received referral request should be sent via EO
system or STP and in addition , need to be communicated via alternative
communication channels – e-mail, phone, etc.
Referral response to the request issued via alternative communication channels
need to be communicated via alternative communication channels.
DNL Receive via phone and e-mail.
Assessment complete
notifications
It is possible that during unavailability EO receives both assessment complete
and DNL. If this is the case priority is with DNL.
Advance control
notification to AEO
Receive via alternative communication channels – NES (PNES), e -mail, phone,
etc.
BCP measure – Arrival notification
Arrival notification Lodge via EO system, STP or NES (ANES) of COFE (if that particular COFE provide
a national arrival system):
Arrival notification lodged via EO system or STP will be queued and
processed after recovery of the component;
Arrival notification lodged via NES (ANES) can be processed and the
person notifying the arrival can get arrival registration response.
Nevertheless, if EO has presented consignments to customs before component
has been recovered it is possible that it will receive IE3N07 message after
Business continuity plan ICS2
Date: 28/07/2023 27 / 31 Doc. Version: 1.20
recovery of the component as consignments are already in state ‘Presented’ or
later state.
Control notification Receive via alternative communication channels – NES (PNES), e -mail, phone,
etc.
BCP measure – Presentation and controls
Presentation information No impact if ENS has been lodged and EO has received ENS registration response
– presentation is not in the scope of ICS2 and should be done via NES (PNES). If
ENS is not lodged at the moment of presentation of the consignments to
customs EO should follow instructions provided by customs.
Control results No impact.
3.3.4 Recovery communication
Actor Actions to be taken by actor Timeframe for actions
CSD When ICS2 Common component has been recovered the CSD updates
unavailability record in MON&BS by indicating unavailability end date/time
[3.6.4]. BCP is automatically deactivated.
asap
NSD When ICS2 National component has been recovered the N SD updates
unavailability record in MON&BS by indicating unavailability end date/time
[3.6.4]. BCP is automatically deactivated.
asap
All NSDs Get e -mail notification on ICS2 Common component and ICS2 National
component recovery and deactivation of BCP [3.6.6]. NSD disseminate it to
MS users.
asap
EO and IT
service
provider
All EOs (including IT service provider) having access to EUCTP get notification
in EUCTP on deactivation of BCP [3.6.5]. asap
3.3.5 Recovery measures
Component Actions to be taken by actors
EO system, STP Referral responses that have been provided only via alternative communication
channels have to be sent via the system (EO system or STP) upon reception of
corresponding referral request.
ICS2 Central
components
Once the component is recovered, the message queues will be processed. There is no
need for EO to re-send the messages.
The sequence of message processing is based on priority defined in section 3.5.
ICS2 National
component
Risk analysis/e-screening is performed to the provided ENSs even if with a delay.
Business continuity plan ICS2
Date: 28/07/2023 28 / 31 Doc. Version: 1.20
3.4 MON&BS and EUCTP unavailability
3.4.1 MON&BS unavailability
In case of MON&BS unavailability it won’t be possible to record unavailability, recovery and/or (de)activate BCP
for ICS2 components . In that case EO (including IT service provider), NSD and CSD should revert to e -mail
communication. Rollback to e-mail procedure can be done by CSD and NSD:
as soon as MON&BS is unavailable in case of scheduled unavailability;
as soon as CSD has notified NSDs on unscheduled unavailability of MON&BS.
The principles who should notify unavailability remain the same as describ ed in this document with the
following deviations:
EO (or IT service provider) should notify EO system unavailability and later recovery of the system to
NSD of MS where EO has:
o legal obligation to lodge ENS and arrival notification;
o already lodged ENS but it has not received assessment complete messages after both pre -
loading and pre-arrival RA.
NSD should:
o communicate ICS2 central and national component unavailability /recovery information to
EOs;
o communicate ICS2 national component unavailability/recovery information to CSD;
o activate BCP for all ICS2 components and communicate it to EOs and CSD (if ICS2 component
has not recovered within 30 min since unavailability was notified);
o deactivate BCP for all ICS2 components and communicate it to EOs and CSD.
CSD should:
o communicate ICS2 central component unavailability/recovery to all NSDs;
o forward ICS2 national component unavailability /recovery information received from NSD to
all other NSDs.
Upon recovery, unavailability notified within the manual procedure and information on (de) activation of BCP
should be recorded in MON&BS. This is done by:
NSD for EO system and ICS2 national component unavailability, or
CSD for ICS2 central component unavailability.
3.4.2 EUCTP unavailability
In case of EUCTP unavailability it won’t be possible for EO to record unavailability and recovery and get
notification on (de)activation of BCP for ICS2 components. In that case EO (including IT service provider) and
NSD should revert to e-mail communication. Rollback to e-mail procedure can be done by NSD:
as soon as EUCTP is unavailable in case of scheduled unavailability;
as soon as CSD has notified NSDs on unscheduled unavailability of EUCTP.
The principles who should notify unavailability remain the same as described in this document with the
following deviations:
EO (or IT service provider) should notify EO system unavailability and later recovery of the system to
NSD of MS where EO has:
o legal obligation to lodge ENS and arrival notification;
o already lodged ENS but it has not received assessment complete messages after both pre -
loading and pre-arrival RA.
NSD should:
o record EO system unavailability/recovery in MON&BS;
o communicate ICS2 central and national component unavailability /recovery information to
EOs;
o communicate activation of BCP for all ICS2 components to EOs;
o communicate deactivation of BCP for all ICS2 components to EOs.
Business continuity plan ICS2
Date: 28/07/2023 29 / 31 Doc. Version: 1.20
3.5 ICS2 Message prioritisation
3.5.1 External domain messages
Priority Message
ID Name Full name Process where it is used
B IE3Fxx E_ENS_xxx_DEC ENS filing L4-ICS2-01 Register filing
B IE3Axx E_ENS_xxx_AMD ENS filing amendment L4-ICS2-07 Amend filing
A IE3Q01 E_DNL_REQ Do Not Load request L4-ICS2-03 Perform risk analysis
B IE3Q02 E_REF_RFI_REQ Additional information request L4-ICS2-03-01 Send referral
A IE3Q03 E_REF_RFS_REQ High Risk Cargo & Mail screening request L4-ICS2-03-01 Send referral
C IE3Q04 E_INV_REQ Invalidation Request L4-ICS2-08 Invalidate filing
C IE3Q05 E_ENS_CNS ENS Consultation L4-ICS2-13 Consult ENS
B IE3R01 E_ENS_REG_RSP ENS Registration Response L4-ICS2-01 Register filing
B IE3R02 E_REF_RFI_RSP Additional information response L4-ICS2-03-01 Send referral
A IE3R03 E_REF_RFS_RSP High Risk Cargo & Mail screening response L4-ICS2-03-01 Send referral
B IE3R04 E_ARV_REG_RSP Arrival Registration Response L4-ICS2-04 Process arrival of means of transport
C IE3R07 E_INV_ACC_RSP Invalidation Acceptance Response L4-ICS2-08 Invalidate filing
B IE3R08 E_ENS_CNS_RES ENS Consultation results L4-ICS2-13 Consult ENS
B IE3N01 E_ELF_VLD_NOT ENS lifecycle validation error notification L4-ICS2-01 Register filing
C IE3N02 E_ENS_NCP_NOT ENS Not complete notification L4-ICS2-02-01 Relate ENS filings
A IE3N03 E_ASM_CMP_NOT Assessment complete notification L4-ICS2-03 Perform risk analysis
C IE3N04 E_REF_RFI_NOT Additional information request notification L4-ICS2-03-01 Send referral
C IE3N05 E_REF_RFS_NOT High Risk Cargo & Mail screening request notification L4-ICS2-03-01 Send referral
A IE3N06 E_ARV_NOT Arrival notification L4-ICS2-04 Process arrival of means of transport
C IE3N07 E_HCS_INC_NOT House consignment in incorrect state notification L4-ICS2-04 Process arrival of means of transport
A IE3N08 E_CON_NOT Control notification L4-ICS2-04 Process arrival of means of transport
C IE3N09 E_AEO_CON_NOT Authorised Economic Operator control notification L4-ICS2-06-01 Handle AEO notification
C IE3N10 E_AMD_NOT Amendment Notification L4-ICS2-07 Amend filing
B
IE3N99 E_ERR_NOT Error notification
L4-ICS2-01 Register filing
L4-ICS2-04 Process arrival of means of
transport
L4-ICS2-07 Amend filing
L4-ICS2-08 Invalidate filing
Business continuity plan ICS2
Date: 28/07/2023 30 / 31 Doc. Version: 1.20
3.6 Information to be provided upon unavailability reporting
and (de)activation of BCP
The main principle is that unavailability and recovery of ICS2 component is reported by economic operator
(with an option to empower IT service provider to do it on behalf of EO if EO is using IT service provider
services), CSD and NSD. Business continuity plan is activated automatically by the system.
The purpose of this section is to define information that has to be provided by involved actors upon
reporting of unavailability or recovery of ICS2 component.
3.6.1 EO – unavailability reporting:
EORI number of Economic operator whose EO system is unavailable;
EO name whose EO system is unavailable;
EORI number of IT service provider – mandatory data element when unavailability is reported by
IT service provider on behalf of EO;
E-mail address of EO or IT service provider who is notifying unavailability;
List of MS (one or several) which should be notified about unavailability;
Unavailability type (scheduled or unscheduled);
Unavailability start date and time;
Expected unavailability end date and time (optional);
Short description on what has caused the unavailability (optional).
3.6.2 EO – recovery reporting:
EORI number of Economic operator whose EO system is recovered;
EO name whose EO system is recovered;
EORI number of IT service provider – mandatory data element when recovery is reported by IT
service provider on behalf of EO;
Unavailability end date and time.
3.6.3 CSD and NSD – unavailability reporting:
Component name;
Unavailability type (scheduled or unscheduled);
Unavailability start date and time;
Expected unavailability end date and time (optional);
Affected service;
Short description on what has caused the unavailability/ Affected functionality (optional).
3.6.4 CSD and NSD – recovery reporting:
Component name;
Unavailability end date and time.
3.6.5 Content of notifications to be sent to EO and IT service provider:
3.6.5.1 After ICS2 component unavailability is reported
All the information provided in sections 3.6.1 or 3.6.3.
3.6.5.2 In case of BCP activation
All the information provided in sections 3.6.1 or 3.6.3 and BCP activation date and time.
3.6.5.3 In case of recovery and BCP deactivation
All the information provided in sections 3.6.2 or 3.6.4 and BCP deactivation date and time.
3.6.6 Content of e-mail notifications to be sent to NSD:
3.6.6.1 After ICS2 component unavailability is reported
All the information provided in sections 3.6.1 or 3.6.3.
Business continuity plan ICS2
Date: 28/07/2023 31 / 31 Doc. Version: 1.20
3.6.6.2 In case of BCP activation
All the information provided in sections 3.6.1 or 3.6.3 and BCP activation date and time.
3.6.6.3 In case of recovery and BCP deactivation
All the information provided in sections 3.6.2 or 3.6.4 and BCP deactivation date and time.
3.7 Scheduled unavailability
MSs and CSD are going to use MON&BS to exchange information on scheduled unavailability. Scheduled
unavailability has to be organised in time windows when there is less operational activity and has to be
recorded in MON&BS as soon as possible but not later than 48 hours in advance [ R04].
EO has to notify scheduled unavailability of EO system as soon as possible but not later than 48 hours in
advance by using EUCTP. This can also be done by empowered IT service provider, but legal responsibility
to notify unavailability remain on EO himself.
In case of scheduled unavailability BCP will be automatically activated for the period when unavailability
is scheduled. All EOs (including IT service provider) having access to EUCTP get notification in EUCTP on
deactivation of BCP [3.6.5].
3.8 Transition from ICS2 Release 1 to ICS2 Release 2
This procedure is applicable as of ICS2 Release 1 nevertheless, EOs will be able to use:
EUCTP2 to notify unavailability and get notifications only as of ICS2 Release 2 ( preliminary
planning – date when procedure will be applicable for ICS2 Release 2 will be communicated
separately)
STP to lodge ENSs, arrival notifications and see ICS2 notifications only as of ICS2 Release 2.
Until EUCTP and STP is developed and deployed procedure is applicable with the following deviations:
EO (or IT service provider) should notify EO system unavailability to NSD where EO has legal
obligation to lodge ENSs. EO can also empower IT service provider to do this but legal obligation
remain on EO himself;
EO cannot use STP to send messages and get notifications therefore only alternative
communication channels can be used;
NSD should notify EOs having l egal obligation to lodge ENSs in its country on ICS2 central and
national component unavailability;
NSD should notify EOs having legal obligation to lodge ENSs in its country on
activation/deactivation of BCP in case of EO system, ICS2 central and/or natio nal component
unavailability;
activation / deactivation of BCP is manual process done by each NSD .
End of document